WELL · 42-371-37371 · DISTRICT 8
Sibley "48" #4
Pecos County · Directional
Sibley "48" #4 (API 42-371-37371) is a permitted well in Pecos County filed by Pecos Production Company; no completion report is on file yet.
The RRC has issued 2 drilling permits in 2004, permitted to 6,600 ft.
Completion filings report 4 formation tops, including Rustler, Lamar, Ramsey Sand, Manzanita Marker.
Its lease has reported 744K barrels of oil and 3.97M mcf of gas since April 2003, last reporting in July 2026. The lease carries 10 wells, so these are lease totals, not this well alone.
Operator of record
Oklahoma City, OK · P-5 Y, filed Jul 8, 2005 · 26 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | P.o.&g. Operating, LLCthrough Apr 2026 |
| Latest permit | Pecos Production CompanyMar 1, 2004 |
- 6,600
- total depth, ft
- 2
- permits on file
- Mar 1, 2004
- last permit issued
- —
- completed
- 744K
- cumulative oil, bbl
- 3.97M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2003 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sibley "48" O-10-37078 | Coyanosa (Cherry Canyon) | P.o.&g. Operating, LLC | 10 | 744K | 3.97M | Apr 2003 – Jul 2026 |
Oil, barrels lease total
Last 12 months 875 · prior 12 1,266(-31%)
Gas, mcf lease total
Last 12 months 41 · prior 12 1,901(-98%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pecos Production CompanyMay 2003 → Dec 2004
- 2Chesapeake Operating, Inc.Jan 2005 → Sep 2012
- 3Shell Western E&POct 2012 → Aug 2015
- 4Meco IV, LLCOct 2015 → Jun 2021
- 5Meco IV Holdco, LLCJul 2021 → Jan 2022
- 6P.o.&g. Operating, LLCFeb 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 542098-99 | Drill | Pecos Production Company | Feb 17, 2004 | Mar 1, 2004 | Mar 1, 2004 | 6,600 |
| 541979-99 | Drill | Pecos Production Company | Feb 12, 2004 | Feb 13, 2004 | Mar 1, 2004 | 6,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-37078 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,650 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,483 | 5,632 | Perforated |
| 5,912 | 6,091 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,238 | 11 | 1,150 S |
| 5.5 | 6,532 | 7.875 | 550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 6, 2005 | Mar 4, 2005 | — |
| 00 | Mar 23, 2005 | Nov 22, 2004 | — |
| 00 | Aug 25, 2004 | Apr 22, 2004 | Yes |
| 00 | Jul 20, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-371-37371 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-371-37371 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/37137371, documented in the API reference.