TEXAS · WELLS · PECOS COUNTY · STATE TREES LEASE · API 42-371-37718 · DISTRICT 7B

State Trees #1802

Plugged

Pecos County · Waha W. (Cherry Canyon) field  · Vertical

State Trees #1802 (API 42-371-37718) is a plugged well in Pecos County, plugged July 28, 2017, last operated by Shell Western E&P.

The RRC has issued one drilling permit (amended once), issued April 20, 2006, permitted to 9,000 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Shell Western E&P on the wellbore schedule.

Completion filings report 6 formation tops, including Bell Canyon, Wiser A, Wiser D, Manzanita A.

Its lease has reported 1.42K barrels of oil and 5.87K mcf of gas since November 2006, last reporting in August 2017.

Operator of record

Shell Western E&P

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Delinquent (D)
P-5 last filed
Jan 4, 2021
Permits on file
1,756
Phone
(832) 337-0694

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleShell Western E&P
Production reportsChesapeake Operating, Inc.through Jul 2009
Latest permitChesapeake Operating, Inc.Apr 20, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
2
permits on file
Apr 20, 2006
last permit issued
Oct 10, 2007
completed
1.42K
cumulative oil, bbl
5.87K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2006 THROUGH Aug 2017

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 10, 2007
Shut in
—
Plugged
Jul 28, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
State Trees O-10-37981Waha, W. (Cherry Canyon)Shell Western E&P11.42K5.87KNov 2006 – Aug 2017

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Nov 2006 → Jul 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
617908-98DrillChesapeake Operating, Inc.Jun 26, 2006Apr 20, 2006Aug 20, 20069,000
617908-99DrillChesapeake Operating, Inc.Apr 19, 2006Apr 20, 2006Aug 20, 20069,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 10, 2007State Trees O-10-37981Waha W. (Cherry Canyon)Shell Western E&PPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,571 ft elevation.Download CSV →

FormationMD ftSubsea
Bell Canyon4,930-2,359
Wiser A5,730-3,159
Wiser D5,862-3,291
Manzanita A5,972-3,401
Manzanita D6,204-3,633
Rhoda Walker B6,351-3,780

Perforations

Perforated and open-hole intervals.

FromToType
6,1406,262Perforated
6,3716,440Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,263111,780 S
5.56,4907.8751,150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 10, 2009Oct 15, 2007—
00May 3, 2007Dec 15, 2006Yes
00Feb 7, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Apr 2014
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000107454H-1 InjectionPlugged Aug 2, 201710,0002,2006,140–6,440

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

012014

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37137718, documented in the API reference.