TEXAS · WELLS · PECOS COUNTY · WEST RANCH LEASE · API 42-371-37739 · DISTRICT 7B

West Ranch #6032

Shut in

Pecos County · Pinon (Overthrust) field · Temp Abandoned  · Vertical

West Ranch #6032 (API 42-371-37739) is a well in Pecos County operated by Longfellow Energy LP, completed October 24, 2006 and listed as temp abandoned on the RRC schedule, shut in April 1, 2024.

The RRC has issued one drilling permit (amended once), issued June 5, 2006, permitted to 5,474 ft.

It was permitted by Sandridge Energy, Inc. and has since transferred to Longfellow Energy LP on the wellbore schedule.

Completion filings report 5 formation tops, including Wolfcamp, Upper Tesnus, Middle Tesnus, Lower Tesnus.

No lease production has been reported under this well’s leases.

Operator of record

Longfellow Energy LP

Permitted by Sandridge Energy, Inc.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Mar 26, 2026
Permits on file
38
Phone
(972) 590-9900

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLongfellow Energy LP
Production reportsLongfellow Energy, LPthrough Mar 2024
Latest permitSandridge Energy, Inc.Jun 5, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,474
total depth, ft
2
permits on file
Jun 5, 2006
last permit issued
Oct 24, 2006
completed
0
cumulative oil, bbl
665K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 24, 2006
Shut in
Apr 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West Ranch G-10-224601Pinon (Overthrust)Longfellow Energy, LP10665KAug 2006 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sandridge Energy, Inc.Aug 2006 → May 2009
  2. 2Sandridge Expl. and Prod., LLCJun 2009 → Feb 2016
  3. 3Occidental W TX Overthrust, Inc.Mar 2016 → Dec 2021
  4. 4Longfellow Energy, LPJan 2022 → Mar 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
619424-98DrillSandridge Energy, Inc.Jan 24, 2007Jun 5, 2006Jul 20, 20066,000
619424-99DrillRiata Energy, Inc.May 17, 2006Jun 5, 2006Jul 20, 20065,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 24, 2006West Ranch G-10-224601Pinon (Overthrust)Longfellow Energy LPTemp Abandoned · shut in Apr 1, 20245,474

Formation tops

As filed on W-2/G-1. Subsea from 4,033 ft elevation.Download CSV →

FormationMD ftSubsea
WolfcampBASE OF WOLFCAMP3,418615
Upper Tesnus3,419614
Middle Tesnus3,870163
Lower Tesnus4,762-729
Basal Tesnus5,060-1,027

Perforations

Perforated and open-hole intervals.

FromToType
3,4343,566Perforated
3,8944,070Perforated
4,7864,790Perforated
5,1005,108Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
71,3508.75420 S
4.55,4746.125435 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 4, 2007Jan 16, 2007Yes
00Feb 15, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37137739, documented in the API reference.