WELL · 42-371-38738 · DISTRICT 8

Lutz #3

Y

Pecos County · Abell (Permian-General) field · Injection  · Vertical

Lutz #3 (API 42-371-38738) is a well in Pecos County operated by Petx Operating LLC, completed July 15, 2011 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued August 31, 2010, permitted to 5,000 ft.

It was permitted by Incline Energy and has since transferred to Petx Operating LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Yates, San Andres, Glorieta, Clear Fork.

Its lease has reported 1.05K barrels of oil and 81 mcf of gas since July 2011, last reporting in July 2026.

It holds an active disposal or injection permit, with 90.1K barrels injected in the 12 months reported through May 2025.

Operator of record

Petx Operating LLC

Permitted by Incline Energy; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Apr 4, 2026 · 5 permits on file · (530) 999-1330

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePetx Operating LLC
Production reportsIncline Energythrough Sep 2013
Latest permitIncline EnergyAug 31, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
2
permits on file
Aug 31, 2010
last permit issued
Jul 15, 2011
completed
1.05K
cumulative oil, bbl
81
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 15, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lutz O-10-42135Abell (Permian-General)Petx Operating LLC11.05K81Jul 2011 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Incline EnergyAug 2011 → Sep 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
701164-98DrillIncline EnergyFeb 1, 2011Aug 31, 2010Apr 13, 20115,000
701164-99DrillIncline EnergyAug 24, 2010Aug 31, 2010—4,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-42135————

Formation tops

As filed on W-2/G-1. Subsea from 2,377 ft elevation.Download CSV →

FormationMD ftSubsea
Yates1,550827
San Andres2,440-63
Glorieta3,030-653
GlorietaGLORIETTA3,030-653
Clear ForkCLEARFORK3,140-763

Perforations

Perforated and open-hole intervals.

FromToType
3,4103,759Perforated
3,6563,759Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62551711250 S
5.54,8807.8751,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 18, 2015Jan 27, 2015—
00Jul 23, 2013Aug 22, 2012—
00Jan 29, 2013Jan 10, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

90.1K
bbl, last 12 reported months
3.12M
bbl, all reported
May 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000108267H-1 InjectionActive1,5001,6003,410–3,759

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 90,139 · prior 12 228,969(-61%)

010K20K30K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37138738, documented in the API reference.