TEXAS · WELLS · POLK COUNTY · BAR M RANCH LEASE · API 42-373-30898 · DISTRICT 03

Bar M Ranch #1

Shut in

Polk County · Edny Duke (Wilcox 9000) field · Temp Abandoned  · Vertical

Bar M Ranch #1 (API 42-373-30898) is a well in Polk County operated by Amrwr LLC, completed January 2, 1999 and listed as temp abandoned on the RRC schedule, shut in July 1, 2020.

The RRC has issued one drilling permit (amended once), issued October 23, 1998, permitted to 10,770 ft.

It was permitted by Famcor Oil, Inc and has since transferred to Amrwr LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Yegua, Wilcox.

Its lease has reported 32.5K barrels of oil and 945K mcf of gas since January 1999, with no volume in the three years through April 2026.

Operator of record

Amrwr LLC

Permitted by Famcor Oil, Inc; the EWA schedule now lists a different operator.

Based in
San Antonio, TX
P-5 status
Active – Extension (X)
P-5 last filed
Dec 5, 2025
Phone
(210) 447-0600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAmrwr LLC
Production reportsAmrwr, LLCthrough Jun 2020
Latest permitFamcor Oil, IncOct 23, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,770
total depth, ft
2
permits on file
Oct 23, 1998
last permit issued
Jan 2, 1999
completed
32.5K
cumulative oil, bbl
945K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1999 THROUGH Jun 2020

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 2, 1999
Shut in
Jul 1, 2020
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bar M Ranch G-3-171900Edny Duke (Wilcox 9000)Amrwr, LLC132.5K945KJan 1999 – Jun 2020

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Famcor Oil, Inc.Jan 1999 → Jul 2004
  2. 2IpactAug 2004 → May 2005
  3. 3Sandhawk Energy, LLCJun 2005 → Jun 2011
  4. 4Geopetra Partners, LLCJul 2011 → Jun 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
480415-98DrillFamcor Oil, IncJan 28, 1999Oct 23, 1998—12,000
480415-99DrillFamcor Oil, IncOct 23, 1998Oct 23, 1998Oct 24, 199812,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 2, 1999Bar M Ranch G-3-171900Edny Duke (Wilcox 9000)Amrwr LLCTemp Abandoned · shut in Jul 1, 202010,770

Formation tops

As filed on W-2/G-1. Subsea from 69 ft elevation.Download CSV →

FormationMD ftSubsea
YeguaYEGUA TOP4,950-4,881
WilcoxWILCOX TOP8,090-8,021

Perforations

Perforated and open-hole intervals.

FromToType
8,9288,936Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,68812.25675 S
4.59,8648.75570 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 9, 1999Jan 13, 1999Yes
00Mar 1, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37330898, documented in the API reference.