TEXAS · WELLS · POLK COUNTY · SOUTHLAND PAPER MILLS LEASE · API 42-373-30961 · DISTRICT 03

Southland Paper Mills #3

Y

Polk County · Seven Oaks N. (Woodbine) field · Producing  · Directional

Southland Paper Mills #3 (API 42-373-30961) is a well in Polk County operated by Zarvona Energy LLC, completed August 4, 2001 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued May 9, 2001, permitted to 12,550 ft.

It was permitted by Mitchell Energy Company L.P. and has since transferred to Zarvona Energy LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Yegua, Wilcox, Midway, Upper Cretaceous.

No lease production has been reported under this well’s leases.

Operator of record

Zarvona Energy LLC

Permitted by Mitchell Energy Company L.P.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jun 2, 2026
Permits on file
98
Phone
(713) 600-0600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleZarvona Energy LLC
Production reportsZarvona Energy LLCthrough Apr 2026
Latest permitMitchell Energy Company L.P.May 9, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,550
total depth, ft
2
permits on file
May 9, 2001
last permit issued
Aug 4, 2001
completed
0
cumulative oil, bbl
3.18M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 4, 2001
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Southland Paper Mills G-3-188838Seven Oaks, N. (Woodbine)Zarvona Energy LLC103.18MAug 2001 – Jul 2026

Gas, mcf lease total

Last 12 months 2,033 · prior 12 3,383(-40%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mitchell Energy Company L.P.Aug 2001 → Mar 2002
  2. 2Devon Energy Operating Co., L.P.Apr 2002 → Jul 2004
  3. 3Devon Energy Production Co, L.P.Aug 2004 → Nov 2014
  4. 4BBX Operating, L.L.C.Dec 2014 → Sep 2017
  5. 5Zarvona Energy LLCNov 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
508756-98DrillMitchell Energy Company L.P.Oct 8, 2001May 9, 2001—13,000
508756-99DrillComstock Oil & Gas, Inc.May 9, 2001May 9, 2001May 14, 200113,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 4, 2001Southland Paper Mills G-3-188838Seven Oaks N. (Woodbine)Zarvona Energy LLCProducing12,550

Formation tops

As filed on W-2/G-1. Subsea from 278 ft elevation.Download CSV →

FormationMD ftSubsea
Yegua2,380-2,102
Wilcox4,940-4,662
Midway9,350-9,072
Upper Cretaceous10,957-10,679
Woodbine12,284-12,006

Perforations

Perforated and open-hole intervals.

FromToType
12,41512,446Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,05014.751,035 S
7.62511,2519.875395 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 8, 2002Oct 11, 2001Yes
00Jun 6, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37330961, documented in the API reference.