TEXAS · WELLS · POLK COUNTY · API 42-373-31124 · DISTRICT 03

West B #1

Shut in

Polk County · Schwab (Wilcox) field · Temp Abandoned  · Vertical

West B #1 (API 42-373-31124) is a well in Polk County operated by Eqv Operating LLC, completed December 29, 2010 and listed as temp abandoned on the RRC schedule, shut in April 1, 2011.

The RRC has issued 2 drilling permits (amended once) between 2008 and 2010, permitted to 11,650 ft.

It was permitted by Unit Petroleum Company and has since transferred to Eqv Operating LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Yegua, Wilcox.

No lease production has been reported under this well’s leases.

Operator of record

Eqv Operating LLC

Permitted by Unit Petroleum Company; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Active (A)
P-5 last filed
Sep 24, 2025
Phone
(405) 648-4409

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnit Petroleum Company
Production reportsUnit Petroleum Companythrough Mar 2011
Latest permitUnit Petroleum CompanyNov 22, 2010
11,650
total depth, ft
3
permits on file
Nov 22, 2010
last permit issued
Dec 29, 2010
completed
0
cumulative oil, bbl
13.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 29, 2010
Shut in
Apr 1, 2011
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West "B" G-3-260891Schwab (Wilcox)Eqv Operating LLC108.5KDec 2010 – Jul 2026
West Gas Unit G-3-253404Jazz (Wilcox Deep)Unit Petroleum Company104.91KOct 2008 – May 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Unit Petroleum CompanyOct 2008 → Mar 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
705648-99RecompletionUnit Petroleum CompanyNov 18, 2010Nov 22, 2010Dec 19, 201010,200
663721-98DrillUnit Petroleum CompanyJul 29, 2009Jun 21, 2008Aug 7, 200813,200
663721-99DrillUnit Petroleum CompanyJun 4, 2008Jun 21, 2008Aug 6, 200813,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 29, 2010West B G-3-260891Schwab (Wilcox)Eqv Operating LLCTemp Abandoned · shut in Apr 1, 201111,650
Oct 8, 2008West Gas Unit G-3-253404Jazz (Wilcox Deep)Unit Petroleum CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 167 ft elevation.Download CSV →

FormationMD ftSubsea
YeguaTOP YEGUA4,840-4,673
YeguaBASE YEGUA6,182-6,015
WilcoxTOP WILCOX7,804-7,637

Perforations

Perforated and open-hole intervals.

FromToType
7,8127,855Perforated
10,25610,301Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,36512.25989 S
4.511,6508.751,986 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 29, 2011Mar 16, 2011—
00Feb 24, 2010Sep 1, 2009Yes
00Dec 11, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37331124, documented in the API reference.