TEXAS · WELLS · POLK COUNTY · API 42-373-31271 · DISTRICT 03

BSM Wildman East #1

N

Polk County  · Vertical

Bsm Wildman East #1 (API 42-373-31271) is a permitted well in Polk County filed by Davis Southern Operating CO LLC; no completion report is on file yet.

The RRC has issued one drilling permit, issued April 25, 2014, permitted to 6,500 ft.

Operator of record

Davis Southern Operating Co LLC

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 11, 2026
Permits on file
127
Phone
(713) 659-3131

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitDavis Southern Operating Co LLCApr 25, 2014
6,500
total depth, ft
1
permits on file
Apr 25, 2014
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
782091-99DrillDavis Southern Operating Co LLCMar 13, 2014Apr 25, 2014—6,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37331271, documented in the API reference.