TEXAS · WELLS · POTTER COUNTY · BIVINS LEASE · API 42-375-00147 · DISTRICT 08
Bivins #A136
Potter County · Panhandle West field · Horizontal
Bivins #A136 (API 42-375-00147) is a plugged horizontal well in Potter County, plugged May 18, 2006, last operated by Pioneer Natural Res. USA Inc..
The RRC has issued 2 drilling permits between 2003 and 2005, permitted to 3,800 ft.
Completion filings report 2 formation tops, including Brown Dolomite, Granite Wash.
Operator of record
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 8, 2026
- Permits on file
- 15,628
- Phone
- (972) 444-4001
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pioneer Natural Res. USA Inc. |
| Production reports | Pioneer Natural Res. USA, Inc.through Apr 2005 |
| Latest permit | Pioneer Natural Res. USA, Inc.May 9, 2005 |
- 3,800
- total depth, ft
- 2
- permits on file
- May 9, 2005
- last permit issued
- Aug 1, 2005
- completed
- 0
- cumulative oil, bbl
- 843K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2006
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 1, 2005
- Shut in
- —
- Plugged
- May 18, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bivins G-14-23399 | Panhandle, West | Pioneer Natural Res. USA, Inc. | 1 | 0 | 843K | Jan 1993 – May 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mesa Operating Ltd PartnershipJan 1993 → Feb 1994
- 2Mesa Operating Co.Mar 1994 → Aug 1997
- 3Pioneer Natural Res. USA, Inc.Sep 1997 → Apr 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 600302-99 | Recompletion | Pioneer Natural Res. USA, Inc. | May 5, 2005 | May 9, 2005 | — | 3,800 |
| 526982-99 | Recompletion | Pioneer Natural Res. USA, Inc. | Jan 7, 2003 | Jan 8, 2003 | — | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 1, 2005 | Bivins G-14-23399 | Panhandle West | Pioneer Natural Res. USA Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,038 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 2,425 | 613 |
| Granite Wash | 2,650 | 388 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,182 | 2,620 | Perforated |
| 2,270 | 5,379 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 227 | 13.75 | — |
| 7 | 2,436 | 9 | — |
| 5.5 | 2,592 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 21, 2006 | Dec 5, 2005 | — |
| 00 | Jul 21, 1993 | Jun 17, 1993 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-375-00147 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-375-00147 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/37500147, documented in the API reference.