WELL · 42-375-31779 · DISTRICT 10

Cruz Creek #105

Y

Potter County · Cruz Creek (Brown Dolomite) field · Injection  · Vertical

Cruz Creek #105 (API 42-375-31779) is a well in Potter County operated by Ldx Operating Company LLC., completed October 1, 2016 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued April 1, 2011, permitted to 5,000 ft.

It was permitted by Laddex, Ltd. and has since transferred to Ldx Operating Company LLC. on the wellbore schedule.

Completion filings report 12 formation tops, including Tubb, Red Cave, Brown Dolomite, Upper Krider.

Its lease has reported 2.04K barrels of oil since July 2011, last reporting in July 2026.

It holds an active disposal or injection permit, with 18.1K barrels injected in the 12 months reported through December 2025.

Operator of record

LDX Operating Company LLC.

Permitted by Laddex, Ltd.; the EWA schedule now lists a different operator.

Amarillo, TX · P-5 Y, filed Sep 4, 2025 · 4 permits on file · (806) 206-2926

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLDX Operating Company LLC.
Production reportsLaddex, Ltd.through Mar 2016
Latest permitLaddex, Ltd.Apr 1, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
1
permits on file
Apr 1, 2011
last permit issued
Oct 1, 2016
completed
2.04K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 1, 2016
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cruz Creek O-14-8636Cruz Creek (Brown Dolomite)LDX Operating Company, LLC.12.04K0Jul 2011 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Laddex, Ltd.Jul 2011 → Mar 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
713152-99DrillLaddex, Ltd.Mar 30, 2011Apr 1, 2011May 7, 20115,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-8636————

Formation tops

As filed on W-2/G-1. Subsea from 3,290 ft elevation.Download CSV →

FormationMD ftSubsea
Tubb2,452838
Red Cave2,858432
Brown Dolomite3,797-507
Brown DolomiteBROWN DOLOMITE - H2S CORROSIVE3,797-507
Upper Krider3,904-614
Lower Krider4,004-714
Moore County Lime4,141-851
CanyonCANYON LIME——
Cliffside——
Ellenburger——
Granite Wash——
PennsylvanianPENN SAND——
Pennsylvanian——
Wolfcamp——

Perforations

Perforated and open-hole intervals.

FromToType
3,8103,867Perforated
3,9023,905Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,50012.25795 S
5.54,4368.75225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 2, 2016Oct 20, 2016—
00Mar 8, 2013Jan 3, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

18.1K
bbl, last 12 reported months
4.27M
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000113992H-1 InjectionActive10,0001,9003,810–4,200

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 18,100 · prior 12 18,100(+0%)

01K2K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37531779, documented in the API reference.