WELL · 42-375-31789 · DISTRICT 10
Baca #1023R
Potter County · Cruz Creek (Canyon Lime) field · Shut IN · Vertical
Baca #1023R (API 42-375-31789) is a well in Potter County operated by Ldx Operating Company LLC., completed April 21, 2012 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued March 20, 2012, permitted to 6,100 ft.
It was permitted by Laddex, Ltd. and has since transferred to Ldx Operating Company LLC. on the wellbore schedule.
Completion filings report 7 formation tops, including Red Cave, Panhandle Lime, Brown Dolomite, Moore County Lime.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Laddex, Ltd.; the EWA schedule now lists a different operator.
Amarillo, TX · P-5 Y, filed Sep 4, 2025 · 4 permits on file · (806) 206-2926
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | LDX Operating Company LLC. |
| Production reports | none |
| Latest permit | Laddex, Ltd.Mar 20, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,100
- total depth, ft
- 1
- permits on file
- Mar 20, 2012
- last permit issued
- Apr 21, 2012
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 21, 2012
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Baca O-14-9199 | Cruz Creek (Canyon Lime) | LDX Operating Company, LLC. | 1 | 0 | 0 | Jan 2013 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 736422-99 | Drill | Laddex, Ltd. | Mar 20, 2012 | Mar 20, 2012 | Mar 25, 2012 | 6,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-9199 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,241 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Red Cave | 2,842 | 399 |
| Panhandle Lime | 3,350 | -109 |
| Brown Dolomite | 3,875 | -634 |
| Moore County Lime | 4,126 | -885 |
| Council Grove | 4,333 | -1,092 |
| Cisco | 5,262 | -2,021 |
| CanyonCANYON LIME | 5,622 | -2,381 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,662 | 5,667 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 430 | 17.5 | 430 S |
| 9.625 | 2,028 | 12.25 | 890 S |
| 5.5 | 6,048 | 8.75 | 255 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 28, 2015 | Oct 30, 2014 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-375-31789 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-375-31789 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/37531789, documented in the API reference.