TEXAS · WELLS · REAGAN COUNTY · API 42-383-31761 · DISTRICT 7B
Estelle Council 70 #2
Reagan County · Conger SW (Penn) field · Vertical
Estelle Council 70 #2 (API 42-383-31761) is a plugged well in Reagan County, plugged August 18, 2015, last operated by Hunt Oil Company.
The RRC has issued 2 drilling permits between 1980 and 2010, permitted to 8,800 ft.
It was permitted by Merit Energy Company and has since transferred to Hunt Oil Company on the wellbore schedule.
Operator of record
Permitted by Merit Energy Company; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- May 20, 2026
- Permits on file
- 1,472
- Phone
- (214) 978-8000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Merit Energy Companythrough Aug 2010 |
| Latest permit | Merit Energy CompanyMar 11, 2010 |
- 8,800
- total depth, ft
- 2
- permits on file
- Mar 11, 2010
- last permit issued
- Nov 1, 1980
- completed
- 0
- cumulative oil, bbl
- 241K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 1, 1980
- Shut in
- —
- Plugged
- Aug 18, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Estelle Council "70" G-10-134498 | Conger, SW (Penn) | Hunt Oil Company | 1 | 0 | 241K | Jan 1993 – Aug 2015 |
| — O-10-26104 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Union Pacific Resources CompanyJan 1993 → Jan 2001
- 2Rme Petroleum CompanyFeb 2001 → Nov 2002
- 3Anadarko E&P Company LPDec 2002 → Nov 2004
- 4Merit Energy CompanyDec 2004 → Aug 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 692561-99 | Recompletion | Merit Energy Company | Mar 9, 2010 | Mar 11, 2010 | — | 8,600 |
| 93452-99 | Drill | Champlin Petroleum Co. | Sep 22, 1980 | Sep 22, 1980 | — | 8,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 1, 1980 | Estelle Council -70- O-10-26104 | Conger SW (Penn) | Union Pacific Resources Company | Plugged | — |
| Nov 1, 1980 | Estelle Council 70 G-10-134498 | Conger SW (Penn) | Hunt Oil Company | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,238 | 8,270 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,142 | 12.25 | 1,950 S |
| 2.375 | 8,199 | — | — |
| 4.5 | 8,600 | 7.875 | 1,445 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 25, 1990 | Apr 30, 1990 | — |
| 00 | Jul 3, 1990 | — | — |
| 00 | Jan 12, 1984 | Nov 7, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-383-31761 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-383-31761 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/38331761, documented in the API reference.