WELL · 42-383-34261 · DISTRICT 7
Cauble Douglas #1
Reagan County · Spraberry (Trend Area) field · Vertical
Cauble Douglas #1 (API 42-383-34261) is a plugged well in Reagan County, plugged April 28, 2010, last operated by Bright & CO..
The RRC has issued one drilling permit, issued March 15, 1994, permitted to 11,700 ft.
Completion filings report 3 formation tops, including T/Dean, T/Strawn, T/Devonian.
Its 2 leases have reported 38.1K barrels of oil and 196K mcf of gas since June 1994, last reporting in June 2010. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- The Colony, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Dec 18, 2015
- Permits on file
- 407
- Phone
- (972) 410-6500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bright & Co. |
| Production reports | Bright & Co.through Sep 2009 |
| Latest permit | Bright & Co.Mar 15, 1994 |
- 11,700
- total depth, ft
- 1
- permits on file
- Mar 15, 1994
- last permit issued
- Jun 1, 1994
- completed
- 38.1K
- cumulative oil, bbl
- 196K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1994 THROUGH Jun 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 1, 1994
- Shut in
- —
- Plugged
- Apr 28, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cauble, Douglas O-9-13950 | Spraberry (Trend Area) | Bright & Co. | 1 | 23.4K | 147K | Nov 1995 – Jun 2010 |
| Cauble, Douglas O-9-13626 | Calvin (Dean) | Bright & Co. | 1 | 14.8K | 48.5K | Jun 1994 – Mar 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bright & Co.Jun 1994 → Jul 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 422060-99 | Drill | Bright & Co. | Mar 15, 1994 | Mar 15, 1994 | Mar 25, 1994 | 11,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-13626 | — | — | — | — |
| — | — O-9-13950 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,683 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T/Dean | 7,908 | -5,225 |
| T/Strawn | 10,210 | -7,527 |
| T/Devonian | 10,944 | -8,261 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,984 | 8,119 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 435 | 17.5 | 425 S |
| 9.625 | 3,605 | 12.25 | 300 S |
| 7 | 8,318 | 8.75 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 11, 1995 | Jun 8, 1994 | Yes |
| 00 | Jul 12, 1994 | Jun 8, 1994 | Yes |
| 00 | Jun 13, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-383-34261 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-383-34261 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/38334261, documented in the API reference.