WELL · 42-383-36626 · DISTRICT 7
Fandango #4
Reagan County · Vertical
Fandango #4 (API 42-383-36626) is a former disposal or injection well in Reagan County, last operated by Wtg Exploration; its UIC permit is no longer active.
The RRC has issued 2 drilling permits between 2009 and 2015, permitted to 10,500 ft.
Completion filings report 3 formation tops, including Canyon, Fusselman, Ellenburger.
Operator of record
Midland, TX · P-5 Y, filed Dec 4, 2025 · 269 permits on file · (432) 664-8876
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Trio Consulting & Management,llcthrough Dec 2012 |
| Latest permit | WTG ExplorationFeb 5, 2015 |
- 10,500
- total depth, ft
- 2
- permits on file
- Feb 5, 2015
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 535
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2010 THROUGH Jul 2025
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Fandango G-9-257495 | Wildcat | WTG Exploration | 1 | 0 | 535 | Feb 2010 – Jul 2025 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Trio Consulting & Management,llcOct 2012 → Dec 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 803334-99 | Recompletion | WTG Exploration | Jan 28, 2015 | Feb 5, 2015 | — | 10,500 |
| 689155-99 | Drill | Trio Consulting & Management,llc | Dec 29, 2009 | Dec 30, 2009 | Jan 19, 2010 | 10,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-257495 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,476 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Canyon | 8,438 | -5,962 |
| Fusselman | 9,580 | -7,104 |
| Ellenburger | 9,740 | -7,264 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,438 | 8,441 | Perforated |
| 8,453 | 8,457 | Perforated |
| 8,460 | 8,482 | Perforated |
| 8,498 | 8,506 | Perforated |
| 8,515 | 8,557 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 11.75 | 629 | 14.75 | 305 S |
| 8.625 | 4,590 | 11 | 1,075 S |
| 5.5 | 8,802 | 7.875 | 480 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 1, 2010 | Aug 16, 2010 | Yes |
| 00 | Sep 27, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-383-36626 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-383-36626 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000111302 | H-1 Injection | Plugged Sep 24, 2020 | 8,000 | 2,200 | 9,900–10,300 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/38336626, documented in the API reference.