TEXAS · WELLS · REAGAN COUNTY · OAK C LEASE · API 42-383-39352 · DISTRICT 6E

Oak C #2WD

Shut in

Reagan County · Hondo Pipeline (Fusselman) field · Shut In  · Vertical

Oak C #2WD (API 42-383-39352) is a well in Reagan County operated by Discovery Natural Resources LLC, completed August 10, 2024 and listed as shut in on the RRC schedule, shut in November 1, 2023.

The RRC has issued one drilling permit, issued February 27, 2015, permitted to 10,285 ft.

Completion filings report 9 formation tops, including Santa Rosa, San Andres, Ellenburger, Fusselman.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit.

Operator of record

Discovery Natural Resources LLC

Based in
Denver, CO
P-5 status
Active (A)
P-5 last filed
Jan 12, 2026
Permits on file
452
Phone
(303) 893-5073

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDiscovery Natural Resources LLC
Production reportsnone
Latest permitDiscovery Natural Resources LLCFeb 27, 2015
10,285
total depth, ft
1
permits on file
Feb 27, 2015
last permit issued
Aug 10, 2024
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2015 THROUGH —

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 10, 2024
Shut in
Nov 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Oak C O-9-18937Hondo Pipeline (Fusselman)Discovery Natural Resources LLC100Apr 2015 – —

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
804125-99DrillDiscovery Natural Resources LLCFeb 25, 2015Feb 27, 2015Mar 26, 201510,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 10, 2024Oak C O-9-18937Hondo Pipeline (Fusselman)Discovery Natural Resources LLCShut In · shut in Nov 1, 202310,285

Formation tops

As filed on W-2/G-1. Subsea from 2,449 ft elevation.Download CSV →

FormationMD ftSubsea
Santa RosaSANTA ROSA SAND5001,949
San Andres2,198251
San AndresSAN ANDRES - SALTWATER FLOW, POS2,198251
Ellenburger8,493-6,044
Fusselman9,383-6,934
Ellenburger9,493-7,044
Clear ForkCLEARFORK——
Ellenburger——
Fusselman——
Grayburg——
Queen——
San AndresSAN ANDRES - SALTWATER FLOW, POS——
Spraberry——
Strawn——

Perforations

Perforated and open-hole intervals.

FromToType
9,4169,427Perforated
9,4369,443Perforated
9,4629,483Perforated
9,5209,529Perforated
9,7059,769Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37563417.5645 S
9.6254,58612.251,475 S
710,2578.751,205 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 25, 2024Aug 13, 2024—
00Apr 16, 2019Feb 12, 2019—
00Mar 14, 2016Mar 7, 2016—
00Oct 12, 2015Sep 8, 2015—
00Jun 26, 2015Jun 2, 2015—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
5.46M
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000112478H-1 InjectionActive20,0004,6259,250–10,250

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/38339352, documented in the API reference.