WELL · 42-389-32176 · DISTRICT 8

King #5

Plugged

Reeves County  · Vertical

King #5 (API 42-389-32176) is a plugged well in Reeves County, plugged December 19, 1999, last operated by Sheridan Production Company, LLC.

The RRC has issued 3 drilling permits between 1999 and 2010, permitted to 6,500 ft.

Its lease has reported 318K barrels of oil and 521K mcf of gas since December 2004, last reporting in July 2026. The lease carries 18 wells, so these are lease totals, not this well alone.

Operator of record

Sheridan Production Company, LLC

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Oct 23, 2020
Permits on file
1,009
Phone
(713) 548-1000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsMajestic Oil & Gas Holding Co.through Mar 2026
Latest permitSheridan Production Company, LLCMay 21, 2010
6,500
total depth, ft
3
permits on file
May 21, 2010
last permit issued
—
completed
318K
cumulative oil, bbl
521K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Dec 19, 1999

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 18 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
King O-10-37498MI Vida (Delaware 4400)Majestic Oil & Gas Holding Co.18318K521KDec 2004 – Jul 2026

Oil, barrels lease total

Last 12 months 1,410 · prior 12 572(+147%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Staley Operating Co.Dec 2004 → Aug 2007
  2. 2Sheridan Production Company, LLCSep 2007 → Jun 2011
  3. 3Finley Resources, Inc.Jul 2011 → Dec 2018
  4. 4RBJ & Associates, LPJan 2019 → Oct 2019
  5. 5JBR-Finley Wells, LLCJul 2020 → Dec 2024
  6. 6Majestic Oil & Gas Holding Co.Feb 2025 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
696315-99RecompletionSheridan Production Company, LLCMay 19, 2010May 21, 2010Jun 5, 20106,500
605909-99ReenterStaley Operating Co.Sep 6, 2005Sep 6, 2005Sep 13, 20056,500
490051-99DrillTitan Resources I, Inc.Dec 6, 1999Dec 6, 1999Dec 10, 19996,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-37498————
—— O-10-37498————

Perforations

Perforated and open-hole intervals.

FromToType
4,3794,418Perforated
4,3794,493Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,10011650 S
5.55,6237.875655 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 8, 2015Nov 5, 2015—
00May 4, 2010Nov 2, 2009—
00Feb 24, 2010May 15, 2006—
00Jan 23, 2007May 15, 2006—
00Aug 23, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
712K
bbl, all reported
Apr 2015
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000096354H-1 InjectionCanceled Dec 9, 20152,0002,1894,379–4,490

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 83(-100%)

05010020142015

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/38932176, documented in the API reference.