TEXAS · WELLS · REEVES COUNTY · TOYAH LAKE LEASE · API 42-389-32603 · DISTRICT 7B

Toyah Lake #1

Plugged

Reeves County · Balmorhea Ranch (Bell Canyon L) field  · Vertical

Toyah Lake #1 (API 42-389-32603) is a plugged well in Reeves County, plugged September 21, 2016, last operated by Centennial Resource Prod LLC.

The RRC has issued one drilling permit (amended once), issued April 24, 2009, permitted to 6,000 ft.

It was permitted by Atlantic Operating, Inc. and has since transferred to Centennial Resource Prod LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Lamar, Olds Sand Bc 2, Olds Sand Bc 5.

Its lease has reported 15K barrels of oil and 26K mcf of gas since July 2009, last reporting in November 2017.

Operator of record

Centennial Resource Prod LLC

Permitted by Atlantic Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Inactive (I)
P-5 last filed
Jul 14, 2022
Permits on file
581
Phone
(720) 499-1400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCentennial Resource Prod LLC
Production reportsCentennial Resource Prod, LLCthrough Feb 2016
Latest permitAtlantic Operating, Inc.Apr 24, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,000
total depth, ft
2
permits on file
Apr 24, 2009
last permit issued
Jul 28, 2009
completed
15K
cumulative oil, bbl
26K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2009 THROUGH Nov 2017

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 28, 2009
Shut in
—
Plugged
Sep 21, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Toyah Lake O-10-39681Balmorhea Ranch (Bell Canyon L)Centennial Resource Prod, LLC115K26KJul 2009 – Nov 2017

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Atlantic Operating, Inc.Jul 2009 → Oct 2012
  2. 2Atlantic Exploration, LLCNov 2012 → Aug 2014
  3. 3Centennial Resource Prod, LLCSep 2014 → Feb 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
680470-98DrillAtlantic Operating, Inc.Nov 30, 2009Apr 24, 2009Jun 15, 20096,000
680470-99DrillAtlantic Operating, Inc.Apr 16, 2009Apr 24, 2009Jun 15, 20096,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 28, 2009Toyah Lake O-10-39681Balmorhea Ranch (Bell Canyon L)Centennial Resource Prod LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,610 ft elevation.Download CSV →

FormationMD ftSubsea
Lamar4,825-2,215
Olds Sand BC 24,871-2,261
Olds Sand BC 54,980-2,370

Perforations

Perforated and open-hole intervals.

FromToType
4,8754,916Perforated
4,9644,985Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,74012.25900 S
5.55,0307.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 19, 2010Sep 23, 2009Yes
00Jan 13, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/38932603, documented in the API reference.