TEXAS · WELLS · REEVES COUNTY · API 42-389-32783 · DISTRICT 7B

Bob Couch 3-10 #1H

Y

Reeves County · Sandbar (Bone Spring) field · Producing  · Horizontal

Bob Couch 3-10 #1H (API 42-389-32783) is a horizontal well in Reeves County operated by Anadarko E&P Onshore LLC, completed June 28, 2011 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 2011 and 2017, permitted to 10,790 ft.

Completion filings report one formation top, including Bone Spring.

No lease production has been reported under this well’s leases.

Operator of record

Anadarko E&P Onshore LLC

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 22, 2025
Permits on file
4,575
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnadarko E&P Onshore LLC
Production reportsAnadarko E&P Onshore LLCthrough Feb 2026
Latest permitAnadarko E&P Onshore LLCMar 31, 2017
10,790
total depth, ft
2
permits on file
Mar 31, 2017
last permit issued
Jun 28, 2011
completed
0
cumulative oil, bbl
362K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 28, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bob Couch 3-10 G-10-290770Sandbar (Bone Spring)Anadarko E&P Onshore LLC10362KJun 2011 – Jul 2026
Bob Couch 3-10 O-10-48397Sandbar (Bone Spring)Anadarko E&P Onshore LLC100Nov 2016 – Jun 2021
Bob Couch 3-10 O-10-41583Phantom (Wolfcamp)Anadarko E&P Onshore LLC100Jun 2011 – Jul 2017

Gas, mcf lease total

Last 12 months 1,612 · prior 12 6,278(-74%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko E&P Onshore LLCJul 2011 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
824739-99Field transferAnadarko E&P Onshore LLCMar 23, 2017Mar 31, 2017Apr 25, 201116,000
712131-99DrillAnadarko Petroleum CorporationMar 15, 2011Mar 24, 2011Apr 25, 201116,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 28, 2011Bob Couch 3-10 G-10-290770Sandbar (Bone Spring)Anadarko E&P Onshore LLCProducing10,790
Jun 28, 2011Bob Couch 3-10 O-10-48397Sandbar (Bone Spring)Anadarko E&P Onshore LLCNot on Schedule—
Jun 28, 2011Bob Couch 3-10 O-10-41583Phantom (Wolfcamp)Anadarko E&P Onshore LLCNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,643 ft elevation.Download CSV →

FormationMD ftSubsea
Bone SpringBONE SPRING 19,439-6,796
Bone SpringBONE SPRING 29,949-7,306
Bone SpringBONE SPRING 310,715-8,072

Perforations

Perforated and open-hole intervals.

FromToType
11,42316,029Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,83617.52,035 S
9.6254,45212.251,525 S
711,0848.751,085 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 2, 2021May 18, 2021Yes
00Apr 28, 2017Apr 5, 2017—
00Jun 27, 2012Sep 9, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/38932783, documented in the API reference.