TEXAS · WELLS · REEVES COUNTY · CHEVRON MINERALS 29 LEASE · API 42-389-33055 · DISTRICT 7B

Chevron Minerals 29 #10SW

Shut in

Reeves County · Balmorhea Ranch (Bell Canyon L) field · Shut In  · Vertical

Chevron Minerals 29 #10SW (API 42-389-33055) is a well in Reeves County operated by Permian Resources Operating LLC, completed March 11, 2015 and listed as shut in on the RRC schedule, shut in January 1, 2024.

The RRC has issued one drilling permit, issued October 25, 2011, permitted to 6,478 ft.

It was permitted by Thompson, J. Cleo and has since transferred to Permian Resources Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Lamar, Bell Canyon, Cherry Canyon.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit.

Operator of record

Permian Resources Operating LLC

Permitted by Thompson, J. Cleo; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Nov 25, 2025
Permits on file
608
Phone
(432) 695-4222

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePermian Resources Operating LLC
Production reportsnone
Latest permitThompson, J. CleoOct 25, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,478
total depth, ft
1
permits on file
Oct 25, 2011
last permit issued
Mar 11, 2015
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 11, 2015
Shut in
Jan 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Chevron Minerals 29 O-10-41345Balmorhea Ranch (Bell Canyon L)Permian Resources Operating, LLC400Dec 2011 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
726357-99DrillThompson, J. CleoOct 14, 2011Oct 25, 2011Nov 20, 20116,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 11, 2015Chevron Minerals 29 O-10-41345Balmorhea Ranch (Bell Canyon L)Permian Resources Operating LLCShut In · shut in Jan 1, 20246,478

Formation tops

As filed on W-2/G-1. Subsea from 2,631 ft elevation.Download CSV →

FormationMD ftSubsea
Lamar4,982-2,351
Bell Canyon5,031-2,400
Cherry Canyon5,930-3,299

Perforations

Perforated and open-hole intervals.

FromToType
5,5416,155Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,67212.25700 S
76,4788.751,900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 31, 2024Jul 12, 2024—
00Jun 7, 2012Feb 10, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
3.45M
bbl, all reported
Apr 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000103778W-14 DisposalActive15,0002,5005,000–6,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/38933055, documented in the API reference.