TEXAS · WELLS · REEVES COUNTY · STEWART 30 LEASE · API 42-389-34018 · DISTRICT 7B

Stewart 30 #1H

Y

Reeves County · Hoefs T-K (Wolfcamp) field · Producing  · Horizontal

Stewart 30 #1H (API 42-389-34018) is a horizontal well in Reeves County operated by Blue Arrow Operating LLC, completed February 14, 2014 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued November 19, 2013, permitted to 10,683 ft.

Completion filings report 6 formation tops, including Lamar, Bell Canyon, Cherry Canyon, Brushy Canyon.

Its lease has reported 259K barrels of oil and 343K mcf of gas since February 2014, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Blue Arrow Operating LLC

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Jun 30, 2026
Permits on file
45
Phone
(432) 741-2583

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBlue Arrow Operating LLC
Production reportsBlue Arrow Operating, LLCthrough Apr 2026
Latest permitBrigham Resources Operating, LLCNov 19, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,683
total depth, ft
2
permits on file
Nov 19, 2013
last permit issued
Feb 14, 2014
completed
259K
cumulative oil, bbl
343K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 14, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stewart 30 O-10-45270Hoefs T-K (Wolfcamp)Blue Arrow Operating, LLC2259K343KFeb 2014 – Jul 2026

Oil, barrels lease total

Last 12 months 6,833 · prior 12 8,255(-17%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 17,751 · prior 12 8,924(+99%)

010K20K30K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Brigham Resources Operating, LLCFeb 2014 → Feb 2017
  2. 2Diamondback E&P LLCMar 2017 → Feb 2026
  3. 3Blue Arrow Operating, LLCMar 2026 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
773388-98RecompletionBlue Arrow Operating, LLCJul 17, 2026Nov 19, 2013Dec 3, 201316,000
773388-99DrillBrigham Resources Operating, LLCNov 7, 2013Nov 19, 2013Dec 3, 201316,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 14, 2014Stewart 30 O-10-45270Hoefs T-K (Wolfcamp)Blue Arrow Operating LLCProducing10,683

Formation tops

As filed on W-2/G-1. Subsea from 2,693 ft elevation.Download CSV →

FormationMD ftSubsea
Lamar5,272-2,579
Bell Canyon5,298-2,605
Cherry Canyon6,106-3,413
Brushy Canyon7,349-4,656
Bone SpringBONE SPRINGS8,938-6,245
Wolfcamp10,424-7,731

Perforations

Perforated and open-hole intervals.

FromToType
11,00315,302Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37558317.5555 S
9.6255,24912.25345 S
710,9908.751,080 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 10, 2026Jul 16, 2026—
00Oct 27, 2014Mar 10, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/38934018, documented in the API reference.