TEXAS · WELLS · REEVES COUNTY · EILAND 8-33 LEASE · API 42-389-34388 · DISTRICT 7B
Eiland 8-33 #1H
Reeves County · Phantom (Wolfcamp) field · Producing · Horizontal
Eiland 8-33 #1H (API 42-389-34388) is a horizontal well in Reeves County operated by Continental Resources Inc., completed December 4, 2014 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued June 30, 2014, permitted to 11,029 ft.
It was permitted by Jagged Peak Energy LLC and has since transferred to Continental Resources Inc. on the wellbore schedule.
Completion filings report 9 formation tops, including Castile, Bell Canyon, Delaware, Cherry Canyon.
Its lease has reported 1.53M barrels of oil and 2.55M mcf of gas since December 2014, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Jagged Peak Energy LLC; the EWA schedule now lists a different operator.
- Based in
- Oklahoma City, OK
- P-5 status
- Active (A)
- P-5 last filed
- Dec 3, 2025
- Permits on file
- 552
- Phone
- (405) 234-9000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Continental Resources Inc. |
| Production reports | Continental Resources, Inc.through Apr 2026 |
| Latest permit | Jagged Peak Energy LLCJun 30, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,029
- total depth, ft
- 2
- permits on file
- Jun 30, 2014
- last permit issued
- Dec 4, 2014
- completed
- 1.53M
- cumulative oil, bbl
- 2.55M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2014 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 4, 2014
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Eiland 8-33 O-10-47059 | Phantom (Wolfcamp) | Continental Resources, Inc. | 3 | 1.53M | 2.55M | Dec 2014 – Jul 2026 |
Oil, barrels lease total
Last 12 months 83,853 · prior 12 84,522(-1%)
Gas, mcf lease total
Last 12 months 263,425 · prior 12 188,783(+40%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Jagged Peak Energy LLCDec 2014 → Jan 2020
- 2Parsley Energy Operations, LLCFeb 2020 → Jan 2021
- 3Pioneer Natural Res. USA, Inc.Feb 2021 → Nov 2021
- 4Continental Resources, Inc.Dec 2021 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 790202-98 | Drill | Jagged Peak Energy LLC | Aug 21, 2014 | Jun 30, 2014 | Jul 6, 2014 | 15,000 |
| 790202-99 | Drill | Jagged Peak Energy LLC | Jun 24, 2014 | Jun 30, 2014 | Jul 6, 2014 | 15,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 4, 2014 | Eiland 8-33 O-10-47059 | Phantom (Wolfcamp) | Continental Resources Inc. | Producing | 11,029 |
Formation tops
As filed on W-2/G-1. Subsea from 2,493 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| CastileCASTILLE | 2,800 | -307 |
| Bell Canyon | 4,800 | -2,307 |
| Delaware | 5,700 | -3,207 |
| DelawareDELAWARE CONSOLIDATED GAS | 6,500 | -4,007 |
| Cherry Canyon | 7,800 | -5,307 |
| Bone SpringBONE SPRINGS | 9,800 | -7,307 |
| Permian (undifferentiated)PERMIAN | 11,300 | -8,807 |
| Wolfcamp | 11,960 | -9,467 |
| Mississippian | — | — |
| Pennsylvanian | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,960 | 19,826 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,427 | 17.5 | 1,072 S |
| 9.625 | 9,830 | 12.25 | 1,730 S |
| 7.625 | 10,052 | 8.75 | 210 S |
| 5.5 | 19,875 | 6.5 | 1,000 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 3, 2015 | Sep 23, 2015 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-389-34388 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-389-34388 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.