WELL · 42-389-35721 · DISTRICT 8

Cessna 54-14-19 #601H

Shut in

Reeves County · Phantom (Wolfcamp) field · Shut IN  · Horizontal

Cessna 54-14-19 #601H (API 42-389-35721) is a horizontal well in Reeves County operated by Trp Operating LLC, completed December 27, 2017 and listed as shut in on the RRC schedule, shut in August 1, 2022.

The RRC has issued one drilling permit, issued February 23, 2017, permitted to 10,685 ft.

It was permitted by Energen Resources Corporation and has since transferred to Trp Operating LLC on the wellbore schedule.

Completion filings report 8 formation tops, including Delaware, Castile, Bell Canyon, Cherry Canyon.

Its lease has reported 325K barrels of oil and 917K mcf of gas since December 2017, last reporting in July 2026.

Operator of record

TRP Operating LLC

Permitted by Energen Resources Corporation; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jul 7, 2026
Permits on file
282
Phone
(713) 357-7530

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTRP Operating LLC
Production reportsTRP Operating LLCthrough Jul 2025
Latest permitEnergen Resources CorporationFeb 23, 2017

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,685
total depth, ft
1
permits on file
Feb 23, 2017
last permit issued
Dec 27, 2017
completed
325K
cumulative oil, bbl
917K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2017 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 27, 2017
Shut in
Aug 1, 2022
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cessna 54-14-19 O-10-49749Phantom (Wolfcamp)TRP Operating LLC1325K917KDec 2017 – Jul 2026

Oil, barrels lease total

Last 12 months 2 · prior 12 0

012202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Energen Resources CorporationDec 2017 → Jan 2019
  2. 2Diamondback E&P LLCFeb 2019 → Aug 2021
  3. 3TRP Operating LLCJul 2025 → Jul 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
823024-99DrillEnergen Resources CorporationFeb 8, 2017Feb 23, 2017Jul 23, 201711,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 27, 2017Cessna 54-14-19 O-10-49749Phantom (Wolfcamp)TRP Operating LLCShut IN · shut in Aug 1, 202210,685

Formation tops

As filed on W-2/G-1. Subsea from 2,799 ft elevation.Download CSV →

FormationMD ftSubsea
DelawareFORD-DELAWARE2,500299
CastileCASTILLE2,800-1
Delaware4,140-1,341
Bell Canyon4,170-1,371
Cherry Canyon5,160-2,361
DelawareDELAWARE CONSOLIDATED GAS6,500-3,701
Bone SpringBONE SPRINGS7,625-4,826
Wolfcamp10,440-7,641
Pennsylvanian——
Permian (undifferentiated)PERMIAN——

Perforations

Perforated and open-hole intervals.

FromToType
11,02215,784Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,10812.251,400 S
710,7648.75420 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 18, 2018Mar 1, 2018Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/38935721, documented in the API reference.