WELL · 42-389-40351 · DISTRICT 8
NO Risk IT Unit 246-245 #4115H
Reeves County · Phantom (Wolfcamp) field · Producing · Horizontal
NO Risk IT Unit 246-245 #4115H (API 42-389-40351) is a horizontal well in Reeves County operated by Greenlake Energy Operating LLC, completed March 24, 2024 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended twice), issued December 8, 2022, permitted to 12,000 ft.
Completion filings report 10 formation tops, including Bell Canyon, Lamar, Cherry Canyon, Bone Spring.
Its lease has reported 1.5M barrels of oil and 3.06M mcf of gas since August 2023, last reporting in July 2026. The lease carries 7 wells, so these are lease totals, not this well alone.
Operator of record
Greenlake Energy Operating LLC
Austin, TX · P-5 Y, filed Feb 4, 2026 · 171 permits on file · (432) 279-0939
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Greenlake Energy Operating LLC |
| Production reports | Greenlake Energy Operating, LLCthrough Apr 2026 |
| Latest permit | Greenlake Energy Operating, LLCDec 8, 2022 |
- 12,000
- total depth, ft
- 3
- permits on file
- Dec 8, 2022
- last permit issued
- Mar 24, 2024
- completed
- 1.5M
- cumulative oil, bbl
- 3.06M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2023 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 24, 2024
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
31.134544, -103.542817
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Reeves County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| NO Risk IT Unit 246-245 O-10-60444 | Phantom (Wolfcamp) | Greenlake Energy Operating, LLC | 7 | 1.5M | 3.06M | Aug 2023 – Jul 2026 |
Oil, barrels lease total
Last 12 months 361,382 · prior 12 853,201(-58%)
Gas, mcf lease total
Last 12 months 1,057,529 · prior 12 1,649,358(-36%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Greenlake Energy Operating, LLCFeb 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 886189-97 | Drill | Greenlake Energy Operating, LLC | Jun 24, 2024 | Dec 8, 2022 | May 15, 2023 | 12,000 |
| 886189-98 | Drill | Greenlake Energy Operating, LLC | Jan 13, 2023 | Dec 8, 2022 | May 15, 2023 | 12,000 |
| 886189-99 | Drill | Greenlake Energy Operating, LLC | Dec 2, 2022 | Dec 8, 2022 | — | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-60444 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,769 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bell Canyon | 5,115 | -2,346 |
| Lamar | 5,116 | -2,347 |
| Cherry Canyon | 5,926 | -3,157 |
| Bone Spring | 8,059 | -5,290 |
| 2ND Bone | 8,951 | -6,182 |
| 3RD Bone | 9,770 | -7,001 |
| Bone Spring | 9,995 | -7,226 |
| Wolfcamp | 10,154 | -7,385 |
| Bell Canyon | — | — |
| CastileCASTILLE | — | — |
| Cherry Canyon | — | — |
| Delaware | — | — |
| DelawareDELAWARE CONSOLIDATED GAS | — | — |
| DelawareFORD / DELAWARE | — | — |
| Permian (undifferentiated)PERMIAN (UNDEFINED) | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,359 | 20,337 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,983 | 17.5 | 1,202 S |
| 8.625 | 9,646 | 10.625 | 1,715 S |
| 5.5 | 20,472 | 7.875 | 1,790 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 23, 2024 | Jun 18, 2024 | Yes |
| 00 | Apr 11, 2024 | Feb 10, 2024 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-389-40351 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-389-40351 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
NO Risk IT Unit 246-24542-389-40357
0.0 KM · Greenlake Energy Operating, LLC · Section with this well →
| Bell Canyon | 5,115 | -2,346 |
| Lamar | 5,116 | -2,347 |
| Cherry Canyon | 5,926 | -3,157 |
| Bone Spring | 8,059 | -5,290 |
| 2ND Bone | 8,951 | -6,182 |
| 3RD Bone | 9,777 | -7,008 |
| Wolfcamp | 10,154 | -7,385 |
| Delaware | — |
12 TOPS · FIRST 8
NO Risk IT Unit 246-24542-389-40343
0.0 KM · Greenlake Energy Operating, LLC · Section with this well →
| Lamar | 5,116 | -2,347 |
| Bone Spring | 8,059 | -5,290 |
| Wolfcamp | 10,154 | -7,385 |
| Castile | — | |
| Bell Canyon | — | |
| Cherry Canyon | — | |
| Delaware | — | |
| Delaware | — |
10 TOPS · FIRST 8
Carpenter State H42-389-41015
0.6 KM · Permian Resources Operating, LLC · Section with this well →
| Rustler | 1,093 | 1,671 |
| Salado | 1,634 | 1,130 |
| Lamar | 5,108 | -2,344 |
| Bell Canyon | 5,143 | -2,379 |
| Cherry Canyon | 6,009 | -3,245 |
| Brushy Canyon | 7,063 | -4,299 |
| Castile | — | |
| Delaware | — |
10 TOPS · FIRST 8
Carpenter State G42-389-41038
0.6 KM · Permian Resources Operating, LLC · Section with this well →
| Delaware | 5,095 | -2,331 |
| Delaware | 5,095 | -2,331 |
| Delaware | 5,095 | -2,331 |
| Bell Canyon | 5,134 | -2,370 |
| Cherry Canyon | 5,989 | -3,225 |
| Bone Spring | 8,003 | -5,239 |
| Wolfcamp | 10,173 | -7,409 |
| Pennsylvanian | — |
10 TOPS · FIRST 8
NO Risk IT Unit 246-24542-389-40342
0.8 KM · Greenlake Energy Operating, LLC · Section with this well →
| Delaware | 5,115 | -2,350 |
| Bone Spring | 9,994 | -7,229 |
| Wolfcamp | 10,153 | -7,388 |
| Bell Canyon | — | |
| Castile | — | |
| Cherry Canyon | — | |
| Delaware | — | |
| Delaware | — |
10 TOPS · FIRST 8
NO Risk IT Unit 246-24542-389-40355
0.8 KM · Greenlake Energy Operating, LLC · Section with this well →
| Lamar | 5,116 | -2,351 |
| Bone Spring | 9,995 | -7,230 |
| Wolfcamp | 10,154 | -7,389 |
| Delaware | — | |
| Delaware | — | |
| Cherry Canyon | — | |
| Castile | — | |
| Bell Canyon | — |
11 TOPS · FIRST 8
NO Risk IT Unit 246-24542-389-40341
0.8 KM · Greenlake Energy Operating, LLC · Section with this well →
| Lamar | 5,116 | -2,351 |
| Bone Spring | 8,060 | -5,295 |
| Wolfcamp | 10,154 | -7,389 |
| Castile | — | |
| Cherry Canyon | — | |
| Delaware | — | |
| Bell Canyon | — | |
| Delaware | — |
10 TOPS · FIRST 8
NO Risk IT Unit 246-24542-389-40354
0.8 KM · Greenlake Energy Operating, LLC · Section with this well →
| Lamar | 5,116 | -2,351 |
| Bone Spring | 8,060 | -5,295 |
| Bone Spring | 8,952 | -6,187 |
| Bone Spring | 9,759 | -6,994 |
| Wolfcamp | 10,154 | -7,389 |
| Permian (undifferentiated) | — | |
| Castile | — | |
| Cherry Canyon | — |
12 TOPS · FIRST 8
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/38940351, documented in the API reference.