WELL · 42-391-00257 · DISTRICT 2

Oconnor #40

Plugged

Refugio County · T-C (5600) field  · Vertical

Oconnor #40 (API 42-391-00257) is a plugged well in Refugio County, plugged December 15, 2010, last operated by T-C Oil Company LLC.

The RRC has issued 3 drilling permits between 2002 and 2008, permitted to 5,668 ft.

It was permitted by T - C Oil Company and has since transferred to T-C Oil Company LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Lagarto, Miocene (undifferentiated), Catahoula, Greta.

Its 3 leases have reported 52K barrels of oil and 203K mcf of gas since January 1993, last reporting in July 2026. The leases carry 21 wells, so these are lease totals, not this well alone.

Operator of record

T-C Oil Company LLC

Permitted by T - C Oil Company; the EWA schedule now lists a different operator.

Based in
Refugio, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
287
Phone
(361) 526-4693

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleT-C Oil Company LLC
Production reportsT - C Oil Companythrough Jul 2008
Latest permitT - C Oil CompanySep 17, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,668
total depth, ft
3
permits on file
Sep 17, 2008
last permit issued
Aug 26, 2005
completed
52K
cumulative oil, bbl
203K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 26, 2005
Shut in
—
Plugged
Dec 15, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 21 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Oconnor O-2-1503T-C (5600)T-C Oil Company, LLC1952K203KJan 1993 – Jul 2026
O'Connor G-2-239410Huff (2800)T - C Oil Company100Aug 2008 – Dec 2010
O'Connor G-2-189460Huff (4770)T - C Oil Company100Mar 2002 – Aug 2005

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1T - C Oil CompanyJan 1993 → Jul 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
670163-99RecompletionT - C Oil CompanyAug 29, 2008Sep 17, 2008Aug 12, 20084,821
605385-99RecompletionT - C Oil CompanyAug 24, 2005Aug 24, 2005Aug 5, 20055,668
518205-99RecompletionT - C Oil CompanyMar 11, 2002Mar 14, 2002Mar 8, 20025,625

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-189460————
—— G-2-239410————
—— O-2-1503————
—— O-2-1503————

Formation tops

As filed on W-2/G-1. Subsea from 66 ft elevation.Download CSV →

FormationMD ftSubsea
Lagarto165
Miocene (undifferentiated)MIOCENE2,073-2,007
Catahoula3,816-3,750
Greta4,483-4,417
Frio4,860-4,794

Perforations

Perforated and open-hole intervals.

FromToType
2,8412,846Perforated
4,9754,980Perforated
5,6445,650Perforated
—5,644Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,22913.75480 S
4.55,7847.875750 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 13, 2008Sep 3, 2008Yes
00Oct 2, 2008——
00Mar 27, 2006Sep 2, 2005Yes
00Dec 1, 2005——
00Mar 13, 2003Apr 22, 2002Yes
00Jul 25, 2002——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39100257, documented in the API reference.