TEXAS · WELLS · REFUGIO COUNTY · API 42-391-00327 · DISTRICT 02

O Connor Dennis et al -L- #L 32

Plugged

Refugio County · Lake Pasture (H-434) field  · Vertical

O Connor Dennis ET AL -L- #L 32 (API 42-391-00327) is a plugged well in Refugio County, plugged December 6, 2021, last operated by T-C Oil Company LLC.

The RRC has issued one drilling permit (amended once), issued December 6, 2001, permitted to 4,497 ft.

It was permitted by T - C Oil Company and has since transferred to T-C Oil Company LLC on the wellbore schedule.

Its 2 leases have reported 3.49M barrels of oil and 49.8M mcf of gas since January 1993, last reporting in July 2026. The leases carry 82 wells, so these are lease totals, not this well alone.

Operator of record

T-C Oil Company LLC

Permitted by T - C Oil Company; the EWA schedule now lists a different operator.

Based in
Refugio, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
287
Phone
(361) 526-4693

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleT-C Oil Company LLC
Production reportsT-C Oil Company, LLCthrough Apr 2026
Latest permitT - C Oil CompanyDec 6, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,497
total depth, ft
2
permits on file
Dec 6, 2001
last permit issued
Aug 7, 2003
completed
3.49M
cumulative oil, bbl
49.8M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 7, 2003
Shut in
—
Plugged
Dec 6, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 82 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Oconnor, Dennis, Etal -L- O-2-2845Lake Pasture (H-440 Sand)T-C Oil Company, LLC813.49M48.5MJan 1993 – Jul 2026
O'Connor, Dennis et al -L- G-2-198753Lake Pasture (H-434)T-C Oil Company, LLC101.31MAug 2003 – Dec 2021

Oil, barrels lease total

Last 12 months 23,596 · prior 12 25,451(-7%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 19,406 · prior 12 24,005(-19%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1T - C Oil CompanyJan 1993 → Dec 2011
  2. 2T-C Oil Company, LLCJan 2012 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
515869-98RecompletionT - C Oil CompanySep 22, 2003Dec 6, 2001Jul 31, 20034,497
515869-99RecompletionT - C Oil CompanyDec 6, 2001Dec 6, 2001—4,452

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 7, 2003O Connor Dennis et al -L- G-2-198753Lake Pasture (H-434)T-C Oil Company LLCPlugged—
Jun 23, 1972Oconnor Dennis Etal -L- O-2-2845Lake Pasture (H-440 Sand)T-C Oil Company LLCPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
4,4034,404Perforated
4,4094,413Perforated
4,4184,426Perforated
4,4334,436Perforated
4,5254,529Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,52113.75685 S
4.55,8878.751,035 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 19, 2004Sep 25, 2003Yes
00Jan 29, 2004——
00Jan 12, 1984Jul 14, 1972—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39100327, documented in the API reference.