TEXAS · WELLS · REFUGIO COUNTY · WILLIAMS, MAUDE ET AL -A- LEASE · API 42-391-00457 · DISTRICT 02

Williams Maude et al -A- #67

Shut in

Refugio County · Tom Oconnor (4950) field · Temp Abandoned  · Vertical

Williams Maude ET AL -A- #67 (API 42-391-00457) is a well in Refugio County operated by Hilcorp Energy Company, completed March 28, 1979 and listed as temp abandoned on the RRC schedule, shut in October 1, 2025.

The RRC has issued one drilling permit, issued October 24, 1978, permitted to 5,914 ft.

It was permitted by Quintana Pet. Corp. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Its lease has reported 862K mcf of gas since January 1993, last reporting volume in September 2025.

Operator of record

Hilcorp Energy Company

Permitted by Quintana Pet. Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Sep 2025
Latest permitQuintana Pet. Corp.Oct 24, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,914
total depth, ft
1
permits on file
Oct 24, 1978
last permit issued
Mar 28, 1979
completed
0
cumulative oil, bbl
862K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2025

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 28, 1979
Shut in
Oct 1, 2025
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Williams, Maude et al -A- G-2-81723Tom Oconnor (4950)Hilcorp Energy Company10862KJan 1993 – Sep 2025

Gas, mcf lease total

Last 12 months 61 · prior 12 259(-76%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Quintana Pet. Corp.Jan 1993 → Nov 2000
  2. 2Hilcorp Energy CompanyDec 2000 → Sep 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
35422-99RecompletionQuintana Pet. Corp.Oct 24, 1978Oct 24, 1978—5,915

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 28, 1979Williams Maude et al -A- G-2-81723Tom Oconnor (4950)Hilcorp Energy CompanyTemp Abandoned · shut in Oct 1, 20255,914
Mar 1, 1949Williams Maude et al -A- O-2-2878Tom Oconnor (5900 Sand)Hilcorp Energy CompanyNot on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
4,8894,894Perforated
—5,908Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,01514350 S
2.3754,878——
5.55,9148.75500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Apr 11, 1979—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000124291H-1 InjectionNot activated6,0002,6005,615–5,650

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39100457, documented in the API reference.