WELL · 42-391-00465 · DISTRICT 2
Williams, Maude et al "A" #76
Refugio County · Vertical
Williams, Maude ET AL "A" #76 (API 42-391-00465) is a permitted well in Refugio County filed by Hilcorp Energy Company; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1984 and 2007, permitted to 4,500 ft.
Completion filings report 6 formation tops, including Lagarto, Oakville, Catahoula, Anahuac.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,454
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Quintana Pet. Corp.through May 1997 |
| Latest permit | Hilcorp Energy CompanyNov 20, 2007 |
- 4,500
- total depth, ft
- 3
- permits on file
- Nov 20, 2007
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 229K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Williams, Maude et al -A- G-2-135290 | Tom Oconnor (4200) | Hilcorp Energy Company | 1 | 0 | 229K | Jan 1993 – Jul 2026 |
| Williams, Maude, Etal -A- O-2-2633 | Tom Oconnor (4400) | Hilcorp Energy Company | 6 | 0 | 0 | Jan 1993 – Mar 2002 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Quintana Pet. Corp.Jan 1993 → May 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 647734-99 | Recompletion | Hilcorp Energy Company | Oct 12, 2007 | Nov 20, 2007 | — | 4,500 |
| 372294-99 | Recompletion | Quintana Pet. Corp. | Apr 18, 1990 | Apr 23, 1990 | — | 4,500 |
| 240393-99 | Recompletion | Quintana Pet. Corp. | May 16, 1984 | May 29, 1984 | — | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-135290 | — | — | — | — |
| — | — O-2-2633 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 57 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,173 | 4,189 | Perforated |
| — | 4,397 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,022 | 12.25 | 350 S |
| 2.875 | 4,490 | 6.75 | 475 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 2, 2002 | Jun 27, 2001 | — |
| 00 | Nov 7, 1991 | Jul 5, 1990 | — |
| 00 | Jan 23, 1991 | Jul 5, 1990 | — |
| 00 | Nov 27, 1990 | Jul 5, 1990 | Yes |
| 00 | Aug 31, 1990 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-391-00465 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-391-00465 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39100465, documented in the API reference.