TEXAS · WELLS · REFUGIO COUNTY · API 42-391-00572 · DISTRICT 02
Heard Fannie V.W. Mrs. #50
Refugio County · Tom O CONNOR(4900) field · Temp Abandoned · Vertical
Heard Fannie V.W. Mrs. #50 (API 42-391-00572) is a well in Refugio County operated by Hilcorp Energy Company, completed June 22, 1994 and listed as temp abandoned on the RRC schedule, shut in November 1, 2022.
The RRC has issued 5 drilling permits between 1987 and 1994, permitted to 5,925 ft.
It was permitted by Quintana Pet. Corp. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 5 formation tops, including Lagarto, Oakville, Catahoula, Anahuac.
Its 4 leases have reported 24.7M barrels of oil and 18.8M mcf of gas since January 1993, last reporting in July 2026. The leases carry 655 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Quintana Pet. Corp.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,454
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | Quintana Pet. Corp.Mar 4, 1994 |
- 5,925
- total depth, ft
- 5
- permits on file
- Mar 4, 1994
- last permit issued
- Jun 22, 1994
- completed
- 24.7M
- cumulative oil, bbl
- 18.8M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 22, 1994
- Shut in
- Nov 1, 2022
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 655 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Heard, Fannie V.W. Mrs. G-2-150604 | Tom O'CONNOR(4900) | Hilcorp Energy Company | 1 | 0 | 1.52M | Jun 1994 – Jul 2026 |
| Heard, Fannie, V. W., Mrs. O-2-2874 | Tom Oconnor (5900 Sand) | Hilcorp Energy Company | 43 | 1.63M | 1.67M | Jan 1993 – Jul 2026 |
| Tom Oconnor (5800 SD) Fld. Unit O-2-5280 | Tom Oconnor (5800) | Hilcorp Energy Company | 594 | 22.8M | 14.9M | Jan 1993 – Jul 2026 |
| Heard, Fannie V.W. Mrs. O-2-7813 | Tom Oconnor (5200, East) | Hilcorp Energy Company | 17 | 312K | 705K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 712,727 · prior 12 548,298(+30%)
Gas, mcf lease total
Last 12 months 117,733 · prior 12 84,230(+40%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Quintana Pet. Corp.Jan 1993 → Nov 2000
- 2Hilcorp Energy CompanyDec 2000 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 421626-99 | Recompletion | Quintana Pet. Corp. | Mar 1, 1994 | Mar 4, 1994 | Jun 17, 1994 | 5,925 |
| 404365-99 | Recompletion | Quintana Pet. Corp. | Oct 7, 1992 | Oct 14, 1992 | Oct 21, 1992 | 5,925 |
| 392791-99 | Recompletion | Quintana Pet. Corp. | Oct 10, 1991 | Oct 14, 1991 | Jan 28, 1992 | 5,925 |
| 356306-99 | Recompletion | Quintana Pet. Corp. | Feb 23, 1989 | Feb 23, 1989 | — | 5,925 |
| 334899-99 | Recompletion | Quintana Pet. Corp. | Aug 21, 1987 | Aug 25, 1987 | — | 5,925 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 22, 1994 | Heard Fannie V.W. Mrs. G-2-150604 | Tom O CONNOR(4900) | Hilcorp Energy Company | Temp Abandoned · shut in Nov 1, 2022 | 5,925 |
| Oct 23, 1992 | Heard Fannie V.W. Mrs. O-2-7813 | Tom Oconnor (5200 East) | Hilcorp Energy Company | Not on Schedule | — |
| Feb 3, 1992 | Tom Oconnor (5800 SD) Fld. Unit O-2-5280 | Tom Oconnor (5800) | Hilcorp Energy Company | Not on Schedule | — |
| Feb 2, 1989 | Heard Fannie V. W. Mrs. O-2-2874 | Tom Oconnor (5900 Sand) | Hilcorp Energy Company | Not on Schedule | — |
| Jan 6, 1984 | Heard Fannie V. W. Mrs. O-2-2586 | Tom Oconnor (5500 Sand) | Hilcorp Energy Company | Not on Schedule | — |
| — | Heard Mrs. Fannie V. W. O-2-5011 | Tom Oconnor (5800) | Quintana Pet. Corp. | Not on Schedule | — |
| — | Tom Oconnor (5800 SD) Fld. Unit O-2-5280 | Tom Oconnor (5800) | Hilcorp Energy Company | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 51 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,810 | 4,822 | Perforated |
| 5,225 | 5,232 | Perforated |
| 5,536 | 5,540 | Perforated |
| 5,771 | 5,779 | Perforated |
| 5,897 | 5,903 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,065 | 16 | 350 S |
| 5 | 5,923 | 8.75 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 20, 1994 | Aug 17, 1994 | Yes |
| 00 | Aug 30, 1994 | — | — |
| 00 | Dec 18, 1992 | Nov 9, 1992 | Yes |
| 00 | Nov 23, 1992 | Apr 15, 1992 | Yes |
| 00 | May 27, 1992 | Apr 15, 1992 | Yes |
| 00 | Apr 23, 1992 | Feb 27, 1989 | Yes |
| 00 | Mar 22, 1989 | Feb 27, 1989 | Yes |
| 00 | Mar 9, 1989 | — | — |
| 00 | Oct 27, 1986 | Oct 17, 1986 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-391-00572 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-391-00572 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39100572, documented in the API reference.