TEXAS · WELLS · REFUGIO COUNTY · TOM OCONNOR (5800 SD) FLD. UNIT LEASE · API 42-391-01150 · DISTRICT 02

Tom Oconnor (5800 SD) Fld. Unit #W236B

Plugged

Refugio County · Tom Oconnor (5800) field  · Vertical

Tom Oconnor (5800 SD) Fld. Unit #W236B (API 42-391-01150) is a plugged well in Refugio County, plugged November 15, 2013, last operated by Hilcorp Energy Company.

The RRC has issued 2 drilling permits between 2007 and 2009, permitted to 5,925 ft.

Its lease has reported 22.8M barrels of oil and 14.9M mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 594 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitHilcorp Energy CompanyJul 30, 2009
5,925
total depth, ft
2
permits on file
Jul 30, 2009
last permit issued
—
completed
22.8M
cumulative oil, bbl
14.9M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Nov 15, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 594 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tom Oconnor (5800 SD) Fld. Unit O-2-5280Tom Oconnor (5800)Hilcorp Energy Company59422.8M14.9MJan 1993 – Apr 2026

Oil, barrels lease total

Last 12 months 673,200 · prior 12 524,408(+28%)

050K100K150K202420252026

Gas, mcf lease total

Last 12 months 117,526 · prior 12 83,712(+40%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Quintana Pet. Corp.Jan 1993 → Nov 2000
  2. 2Hilcorp Energy CompanyDec 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
683284-99RecompletionHilcorp Energy CompanyJul 21, 2009Jul 30, 2009—5,925
649067-99RecompletionHilcorp Energy CompanyNov 6, 2007Nov 14, 2007—5,925

Completions

CompletedLeaseFieldOperatorStatusDepth
—Oconnor Thomas -C- O-2-5013Tom Oconnor (5800)Quintana Pet. Corp.Plugged—
—Tom Oconnor (5800 SD) Fld. Unit O-2-5280Tom Oconnor (5800)Hilcorp Energy CompanyPlugged—
—Oconnor Thomas -C- O-2-2587Tom Oconnor (5500 Sand)Hilcorp Energy CompanyPlugged—
—Oconnor Thomas -C- O-2-1543Tom OconnorHilcorp Energy CompanyPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
—5,800Perforated

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00May 25, 1984——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000095673H-1 InjectionPlugged Nov 25, 201310,0002,5005,000–5,770

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39101150, documented in the API reference.