TEXAS · WELLS · REFUGIO COUNTY · API 42-391-01168 · DISTRICT 02

Tom O CONNOR(5600 Foot Sand)unit #18

Shut in

Refugio County · Tom O Connor (5600 Foot Sand) field · Shut In  · Vertical

Tom O Connor(5600 Foot Sand)Unit #18 (API 42-391-01168) is a well in Refugio County operated by Hilcorp Energy Company, completed March 19, 2009 and listed as shut in on the RRC schedule, shut in February 1, 2010.

The RRC has issued 5 drilling permits between 1977 and 2012, permitted to 5,911 ft.

Completion filings report 7 formation tops, including Lagarto, Surface Sand Clay, Oakville, Catahoula.

Its 4 leases have reported 29.1M barrels of oil and 19.5M mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 763 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitHilcorp Energy CompanyMar 23, 2012
5,911
total depth, ft
5
permits on file
Mar 23, 2012
last permit issued
Mar 19, 2009
completed
29.1M
cumulative oil, bbl
19.5M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 19, 2009
Shut in
Feb 1, 2010
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 763 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Oconnor, Thomas, -C- O-2-2587Tom Oconnor (5500 Sand)Hilcorp Energy Company512.22M2.1MJan 1993 – Apr 2026
O'Connor, Thomas -C- O-2-2876Tom Oconnor (5900 Sand)Hilcorp Energy Company592.99M2.17MJan 1993 – Apr 2026
Tom Oconnor (5800 SD) Fld. Unit O-2-5280Tom Oconnor (5800)Hilcorp Energy Company59422.8M14.9MJan 1993 – Apr 2026
Tom O'CONNOR(5600 Foot Sand)unit O-2-8950Tom O'Connor (5600 Foot Sand)Hilcorp Energy Company591.13M357KMar 2005 – Apr 2026

Oil, barrels lease total

Last 12 months 692,664 · prior 12 549,682(+26%)

050K100K150K202420252026

Gas, mcf lease total

Last 12 months 118,104 · prior 12 84,457(+40%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Quintana Pet. Corp.Jan 1993 → Nov 2000
  2. 2Hilcorp Energy CompanyDec 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
735768-99RecompletionHilcorp Energy CompanyMar 9, 2012Mar 23, 2012—5,911
678959-99RecompletionHilcorp Energy CompanyFeb 26, 2009Mar 10, 2009Mar 11, 20095,911
641793-99RecompletionHilcorp Energy CompanyJul 2, 2007Jul 14, 2007Nov 13, 20075,911
489330-99RecompletionQuintana Pet. Corp.Nov 9, 1999Dec 10, 1999Dec 17, 19995,911
166-99RecompletionQuintana Pet. Corp.Jun 7, 1977Jun 7, 1977—5,911

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 19, 2009Tom O CONNOR(5600 Foot Sand)unit O-2-8950Tom O Connor (5600 Foot Sand)Hilcorp Energy CompanyShut In · shut in Feb 1, 20105,911
Nov 15, 2007Oconnor Thomas -C- O-2-2587Tom Oconnor (5500 Sand)Hilcorp Energy CompanyNot on Schedule—
Dec 27, 1999Tom Oconnor (5800 SD) Fld. Unit O-2-5280Tom Oconnor (5800)Hilcorp Energy CompanyNot on Schedule—
Mar 13, 1992O Connor Thomas -C- O-2-2876Tom Oconnor (5900 Sand)Hilcorp Energy CompanyNot on Schedule—
Aug 29, 1977Oconnor Thomas -C- O-2-2587Tom Oconnor (5500 Sand)Hilcorp Energy CompanyNot on Schedule—
—O Connor Thomas -C- O-2-2876Tom Oconnor (5900 Sand)Hilcorp Energy CompanyNot on Schedule—
—Oconnor Thomas -C- O-2-5013Tom Oconnor (5800)Quintana Pet. Corp.Not on Schedule—
—Oconnor Thomas -C- O-2-1543Tom OconnorHilcorp Energy CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 56 ft elevation.Download CSV →

FormationMD ftSubsea
LagartoLARGARTO1,500-1,444
Surface Sand Clay1,500-1,444
LagartoLARGARTO2,750-2,694
Oakville2,750-2,694
CatahoulaCATAHOULA(MIOCENE)3,300-3,244
Oakville3,300-3,244
AnahuacANAHUAC(MIOCENE)4,100-4,044
CatahoulaCATAHOULA (MIOCENE)4,100-4,044
AnahuacANAHUAC (MIOCENE)4,365-4,309
FrioFRIO-GRETA(OLIGOCENE)4,365-4,309
FrioFRIO-GRETA (OLIG)4,758-4,702
FrioMIDDLE FRIO (SINTON)5,000-4,944
FrioMIDDLE FRIO (SINTON)5,400-5,344
FrioLOWER FRIO (OLIGOCENE)5,880-5,824
FrioFRIO (OLIG)5,911-5,855
NO Change——

Perforations

Perforated and open-hole intervals.

FromToType
5,4775,482Perforated
5,5165,520Perforated
5,5435,548Perforated
5,7155,721Perforated
5,7985,804Perforated
—5,701Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,05116350 S
1.55,489——
55,9098.75500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 14, 2009Apr 2, 2009Yes
00Aug 7, 2009——
00Mar 11, 2008Dec 12, 2007Yes
00Feb 13, 2008——
00Apr 20, 2000Feb 3, 2000Yes
00Mar 13, 2000——
00Nov 10, 1993Jul 2, 1993—
00May 25, 1989——
00Jan 12, 1984Sep 13, 1977—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39101168, documented in the API reference.