TEXAS · WELLS · REFUGIO COUNTY · API 42-391-01323 · DISTRICT 02

Lambert M. F. #66

Shut in

Refugio County · Tom Oconnor (3900) field · Temp Abandoned  · Vertical

Lambert M. F. #66 (API 42-391-01323) is a well in Refugio County operated by Hilcorp Energy Company, completed February 17, 2005 and listed as temp abandoned on the RRC schedule, shut in September 1, 2012.

The RRC has issued 2 drilling permits between 1982 and 2005, permitted to 5,918 ft.

Completion filings report one formation top, including No Change.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Aug 2012
Latest permitHilcorp Energy CompanyMar 14, 2005
5,918
total depth, ft
2
permits on file
Mar 14, 2005
last permit issued
Feb 17, 2005
completed
0
cumulative oil, bbl
554K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 17, 2005
Shut in
Sep 1, 2012
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lambert, M. F. G-2-209879Tom Oconnor (3900)Hilcorp Energy Company10435KFeb 2005 – Jul 2026
Lambert, M. F. G-2-101477Tom O'Connor (4150)Hilcorp Energy Company10119KJan 1993 – Feb 2005

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pennzoil Exploration & Prod. Co.Jan 1993 → May 1996
  2. 2Hilcorp Energy CompanyMar 2005 → Aug 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
558591-99RecompletionHilcorp Energy CompanyMar 4, 2005Mar 14, 2005—5,915
166418-99RecompletionPennzoil Producing Co.Jul 14, 1982Jul 14, 1982—5,918

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 17, 2005Lambert M. F. G-2-209879Tom Oconnor (3900)Hilcorp Energy CompanyTemp Abandoned · shut in Sep 1, 20125,918
Aug 23, 1982Lambert M. F. G-2-101477Tom O Connor (4150)Hilcorp Energy CompanyNot on Schedule—
—Lambert M. F. O-2-2880Tom Oconnor (5900 Sand)Hilcorp Energy CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 62 ft elevation.Download CSV →

FormationMD ftSubsea
NO Change——

Perforations

Perforated and open-hole intervals.

FromToType
4,0404,046Perforated
4,1244,140Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,217—528 S
2.3754,087——
75,906——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 24, 2005Apr 8, 2005Yes
00Aug 9, 2005——
00Jan 12, 1984Aug 27, 1982—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000094925W-14 DisposalNot activated20,0001,8153,630–4,120

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39101323, documented in the API reference.