WELL · 42-391-01324 · DISTRICT 2

M. F. Lambert #67

N

Refugio County  · Vertical

M. F. Lambert #67 (API 42-391-01324) is a permitted well in Refugio County filed by Hilcorp Energy Company; no completion report is on file yet.

The RRC has issued 3 drilling permits (amended once) between 2000 and 2010, permitted to 5,900 ft.

Completion filings report one formation top, including No Change.

Its 3 leases have reported 2.24M barrels of oil and 4.21M mcf of gas since January 1993, last reporting in July 2026. The leases carry 86 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitHilcorp Energy CompanyJun 18, 2010
5,900
total depth, ft
4
permits on file
Jun 18, 2010
last permit issued
—
completed
2.24M
cumulative oil, bbl
4.21M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 86 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lambert, M. F. O-2-2115Tom Oconnor (4400)Hilcorp Energy Company451.73M2.54MJan 1993 – Jul 2026
Lambert, M. F. O-2-2880Tom Oconnor (5900 Sand)Hilcorp Energy Company40504K1.58MJan 1993 – Jul 2026
Lambert Gas Unit G-2-218218Tom Oconnor (4950)Hilcorp Energy Company1092.9KJul 2004 – Feb 2011

Oil, barrels lease total

Last 12 months 76,015 · prior 12 99,613(-24%)

05K10K15K202420252026

Gas, mcf lease total

Last 12 months 3,086 · prior 12 5,802(-47%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pennzoil Exploration & Prod. Co.Jan 1993 → Feb 1999
  2. 2Pennzenergy Exp. & Prod., L.L.C.Mar 1999 → Mar 2000
  3. 3Devon Energy Production Co, L.P.Apr 2000 → Jul 2002
  4. 4Hilcorp Energy CompanyAug 2002 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
697776-99RecompletionHilcorp Energy CompanyJun 17, 2010Jun 18, 2010Feb 10, 20115,900
612174-99RecompletionHilcorp Energy CompanyJan 10, 2006Jan 13, 2006—5,900
502254-98RecompletionDevon Energy Production Co, L.P.Mar 13, 2001Mar 13, 2001Feb 24, 20015,900
502254-99RecompletionDevon Energy Production Co, L.P.Nov 21, 2000Nov 21, 2000—5,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-218218————
—— O-2-2115————
—— O-2-2880————

Formation tops

As filed on W-2/G-1. Subsea from 48 ft elevation.Download CSV →

FormationMD ftSubsea
NO Change——

Perforations

Perforated and open-hole intervals.

FromToType
4,3794,388Perforated
5,0025,006Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,212—528 S
75,9249.875528 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 2, 2011May 26, 2011—
00Jan 22, 2007Jan 26, 2006Yes
00Aug 17, 2006——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39101324, documented in the API reference.