TEXAS · WELLS · REFUGIO COUNTY · API 42-391-01461 · DISTRICT 02

O Connor Thomas -A- #34

Shut in

Refugio County · Tom O Connor (4830) field · Temp Abandoned  · Vertical

O Connor Thomas -A- #34 (API 42-391-01461) is a well in Refugio County operated by Hilcorp Energy Company, completed January 30, 1996 and listed as temp abandoned on the RRC schedule, shut in November 1, 2008.

The RRC has issued one drilling permit, issued February 12, 1996, permitted to 6,495 ft.

It was permitted by Quintana Pet. Corp. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including Lagarto, Oakville, Anahuac, Frio.

Its 2 leases have reported 22.8M barrels of oil and 15M mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 595 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Quintana Pet. Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitQuintana Pet. Corp.Feb 12, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,495
total depth, ft
1
permits on file
Feb 12, 1996
last permit issued
Jan 30, 1996
completed
22.8M
cumulative oil, bbl
15M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 30, 1996
Shut in
Nov 1, 2008
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 595 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tom Oconnor (5800 SD) Fld. Unit O-2-5280Tom Oconnor (5800)Hilcorp Energy Company59422.8M14.9MJan 1993 – Apr 2026
O'Connor, Thomas -A- G-2-157803Tom O'Connor (4830)Hilcorp Energy Company10127KJan 1996 – Oct 2008

Oil, barrels lease total

Last 12 months 673,200 · prior 12 524,408(+28%)

050K100K150K202420252026

Gas, mcf lease total

Last 12 months 117,526 · prior 12 83,712(+40%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Quintana Pet. Corp.Jan 1993 → Nov 2000
  2. 2Hilcorp Energy CompanyDec 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
444518-99RecompletionQuintana Pet. Corp.Feb 6, 1996Feb 12, 1996Jan 23, 19966,495

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 30, 1996O Connor Thomas -A- G-2-157803Tom O Connor (4830)Hilcorp Energy CompanyTemp Abandoned · shut in Nov 1, 20086,495
—Tom Oconnor (5800 SD) Fld. Unit O-2-5280Tom Oconnor (5800)Hilcorp Energy CompanyNot on Schedule—
—Tom Oconnor (5800 SD) Fld. Unit O-2-5280Tom Oconnor (5800)Hilcorp Energy CompanyNot on Schedule—
—Oconnor Thomas -A- O-2-5012Tom Oconnor (5800)Hilcorp Energy CompanyNot on Schedule—
—Oconnor Thomas -A- O-2-1542Tom OconnorHilcorp Energy CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 64 ft elevation.Download CSV →

FormationMD ftSubsea
LagartoLARGARTO1,500-1,436
Oakville2,750-2,686
AnahuacANAHUAC (MIOCENE)4,100-4,036
FrioFRIO-GRETA (OLIGOCENE)4,365-4,301
FrioMIDDLE FRIO (SINTON)5,000-4,936
FrioLOWER FRIO (OLIGOCENE)5,880-5,816

Perforations

Perforated and open-hole intervals.

FromToType
4,823483Perforated
—5,800Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7553616150 S
75,9459.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 22, 1996Mar 1, 1996Yes
00May 10, 1996——
00May 25, 1984——
00Jan 12, 1984——

Well logs

1 log loaded from the RRC's log index, the latest received Mar 5, 2020. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
OtherSpans Oakville, Anahuac, FrioTIFF4,000 to 6,495Mar 5, 20205.16

"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000123030H-1 InjectionNot activated6,0002,2004,435–4,493

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39101461, documented in the API reference.