TEXAS · WELLS · REFUGIO COUNTY · API 42-391-01511 · DISTRICT 02

O Connor Thomas A #20

Plugged

Refugio County · Tom O Connor (5770 U South) field  · Vertical

O Connor Thomas A #20 (API 42-391-01511) is a plugged well in Refugio County, plugged January 26, 2006, last operated by Hilcorp Energy Company.

The RRC has issued 5 drilling permits (amended 4 times) between 1989 and 2006, permitted to 5,910 ft.

Completion filings report 6 formation tops, including Lagarto, Oakville, Catahoula, Anahuac.

Its 5 leases have reported 24.1M barrels of oil and 16.5M mcf of gas since January 1993, last reporting in July 2026. The leases carry 670 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitHilcorp Energy CompanyJan 23, 2006
5,910
total depth, ft
9
permits on file
Jan 23, 2006
last permit issued
Apr 16, 2002
completed
24.1M
cumulative oil, bbl
16.5M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 16, 2002
Shut in
—
Plugged
Jan 26, 2006

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 670 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Oconnor, Thomas -A- O-2-1542Tom OconnorHilcorp Energy Company36650K756KJan 1993 – Jul 2026
Oconnor, Thomas, -A- O-2-2875Tom Oconnor (5900 Sand)Hilcorp Energy Company11107K236KJan 1993 – Jul 2026
Tom Oconnor (5800 SD) Fld. Unit O-2-5280Tom Oconnor (5800)Hilcorp Energy Company59422.8M14.9MJan 1993 – Jul 2026
O'Connor, Thomas "A" O-2-7579Tom O'Connor (5770 U, South)Hilcorp Energy Company28538K627KJan 1993 – Jul 2026
O'Connor, Thomas "A" G-2-151876Tom Oconnor (5275)Hilcorp Energy Company105.61KSep 1994 – Aug 2003

Oil, barrels lease total

Last 12 months 734,019 · prior 12 569,900(+29%)

050K100K150K202420252026

Gas, mcf lease total

Last 12 months 118,722 · prior 12 86,153(+38%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Quintana Pet. Corp.Jan 1993 → Nov 2000
  2. 2Hilcorp Energy CompanyDec 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
612517-99RecompletionHilcorp Energy CompanyJan 17, 2006Jan 23, 2006—5,910
501566-98RecompletionHilcorp Energy CompanyApr 24, 2002Nov 7, 2000Apr 8, 20025,910
501566-99RecompletionQuintana Pet. Corp.Nov 3, 2000Nov 7, 2000—5,909
413850-96RecompletionQuintana Pet. Corp.Sep 19, 1994Jul 19, 1993Aug 22, 19945,909
413850-97RecompletionQuintana Pet. Corp.Aug 1, 1994Jul 19, 1993—5,909
413850-98RecompletionQuintana Pet. Corp.Jul 21, 1994Jul 19, 1993—5,909
413850-99RecompletionQuintana Pet. Corp.Jul 14, 1993Jul 19, 1993—5,909
398592-99RecompletionQuintana Pet. Corp.Apr 21, 1992Apr 22, 1992Apr 22, 19925,909
365378-99DrillQuintana Pet. Corp.Oct 19, 1989Dec 19, 1989—5,909

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 16, 2002O Connor Thomas A O-2-7579Tom O Connor (5770 U South)Hilcorp Energy CompanyPlugged—
Sep 12, 1994Tom Oconnor (5800 SD) Fld. Unit O-2-5280Tom Oconnor (5800)Hilcorp Energy CompanyPlugged—
Sep 12, 1994O Connor Thomas A G-2-151876Tom Oconnor (5275)Hilcorp Energy CompanyPlugged—
Apr 28, 1992Oconnor Thomas -A- O-2-2875Tom Oconnor (5900 Sand)Hilcorp Energy CompanyPlugged—
Feb 22, 1977O Connor Thomas A O-2-7579Tom O Connor (5770 U South)Hilcorp Energy CompanyPlugged—
Feb 22, 1977Oconnor Thomas -A- O-2-1542Tom OconnorHilcorp Energy CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 52 ft elevation.Download CSV →

FormationMD ftSubsea
LagartoLARGARTO1,500-1,448
Oakville2,750-2,698
CatahoulaCATAHOULA (MIOCENE)3,300-3,248
CatahoulaCATAHOULA(MIOCENE)3,300-3,248
AnahuacANAHUAC (MIOCENE)4,100-4,048
AnahuacANAHUAC(MIOCENE)4,100-4,048
FrioFRIO-GRETA (OLIGOCENE)4,365-4,313
FrioFRIO-GRETA(OLIGOCENE)4,365-4,313
FrioMIDDLE FRIO (SINTON)5,000-4,948
FrioMIDDLE FRIO(SINTON)5,000-4,948
FrioLOWER FRIO (OLIGOCENE)5,880-5,828
FrioLOWER FRIO(OLIGOCENE)5,880-5,828
NO Change——

Perforations

Perforated and open-hole intervals.

FromToType
5,2765,282Perforated
5,7165,723Perforated
5,7165,726Perforated
5,7905,802Perforated
5,8645,875Perforated
—5,725Perforated
—5,900Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7549916100 S
75,7539.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 4, 2006May 7, 2002—
00Oct 13, 2005Oct 27, 1994Yes
00May 11, 1995Oct 27, 1994Yes
00Jan 20, 1995Oct 27, 1994Yes
00Dec 9, 1994——
00Nov 4, 1994May 14, 1992Yes
00Jun 11, 1992May 14, 1992Yes
00May 26, 1992——
00Jun 12, 1990Oct 23, 1989—
00Apr 12, 1990——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

682K
bbl, last 12 reported months
682K
bbl, all reported
Nov 2002
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000091973H-1 InjectionPlugged Feb 6, 20065,0002,8005,710–5,730

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 681,848

050K100K150K2002

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39101511, documented in the API reference.