TEXAS · WELLS · REFUGIO COUNTY · API 42-391-01818 · DISTRICT 02

Thomas O Connor D #13

Shut in

Refugio County · Mary Ellen Oconnor (FS-96) field · Shut In  · Vertical

Thomas O Connor D #13 (API 42-391-01818) is a well in Refugio County operated by Hilcorp Energy Company, completed January 27, 2016 and listed as shut in on the RRC schedule, shut in July 1, 2022.

The RRC has issued 2 drilling permits between 2007 and 2015, permitted to 6,000 ft.

Completion filings report 4 formation tops, including Catahoula, Frio, Jackson, No Change.

Its 3 leases have reported 39.7K barrels of oil and 133K mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Jan 2015
Latest permitHilcorp Energy CompanyDec 22, 2015
6,000
total depth, ft
2
permits on file
Dec 22, 2015
last permit issued
Jan 27, 2016
completed
39.7K
cumulative oil, bbl
133K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 27, 2016
Shut in
Jul 1, 2022
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thomas O'Connor 'D' O-2-11179Mary Ellen Oconnor (FS-96)Hilcorp Energy Company100Jan 2016 – Jul 2026
Oconnor, Thos. -D- O-2-965Mary Ellen Oconnor (FQ-40 Sand)Hilcorp Energy Company238.8K116KJan 1993 – Jul 2024
Oconnor, Thomas "D" O-2-9147Mary Ellen Oconnor (FQ- 9)Hilcorp Energy Company194716.9KAug 2007 – Jan 2016

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Quintana Pet. Corp.Jan 1993 → Nov 2000
  2. 2Hilcorp Energy CompanyDec 2000 → Jan 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
812623-99RecompletionHilcorp Energy CompanyDec 10, 2015Dec 22, 2015Jan 22, 20166,000
639075-99RecompletionHilcorp Energy CompanyMay 15, 2007Jul 31, 2007May 18, 20076,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 27, 2016Thomas O Connor D O-2-11179Mary Ellen Oconnor (FS-96)Hilcorp Energy CompanyShut In · shut in Jul 1, 20226,000
Sep 4, 2015Oconnor Thos. -D- O-2-965Mary Ellen Oconnor (FQ-40 Sand)Hilcorp Energy CompanyPlugged—
May 23, 2007Oconnor Thomas D O-2-9147Mary Ellen Oconnor (FQ- 9)Hilcorp Energy CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 19 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula3,585-3,566
Frio4,354-4,335
JacksonJACKSON/YEGUA——
NO Change——

Perforations

Perforated and open-hole intervals.

FromToType
5,4355,444Perforated
5,7005,706Perforated
5,8525,860Perforated
5,8825,907Perforated
—5,849Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,34513.75475 S
5.56,0008.75975 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 27, 2016Apr 18, 2016—
00Jan 20, 2016Sep 11, 2015—
00Nov 12, 2007Aug 14, 2007Yes
00Sep 27, 2007——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39101818, documented in the API reference.