TEXAS · WELLS · REFUGIO COUNTY · API 42-391-02033 · DISTRICT 02

O Connor Thomas A #99

Shut in

Refugio County · Tom Oconnor (5400 Sand) field · Producing  · Vertical

O Connor Thomas A #99 (API 42-391-02033) is a well in Refugio County operated by Hilcorp Energy Company, completed April 15, 2013 and listed as producing on the RRC schedule, shut in April 1, 2017.

The RRC has issued 2 drilling permits between 2001 and 2012, permitted to 5,900 ft.

Completion filings report 6 formation tops, including Surface Sand Clay, Lagarto, Oakville, Catahoula.

Its 3 leases have reported 23.1M barrels of oil and 15.9M mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 615 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitHilcorp Energy CompanySep 25, 2012
5,900
total depth, ft
2
permits on file
Sep 25, 2012
last permit issued
Apr 15, 2013
completed
23.1M
cumulative oil, bbl
15.9M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 15, 2013
Shut in
Apr 1, 2017
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 615 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tom Oconnor (5800 SD) Fld. Unit O-2-5280Tom Oconnor (5800)Hilcorp Energy Company59422.8M14.9MJan 1993 – Apr 2026
O'Connor, Thomas "A" O-2-3662Tom Oconnor (5400 Sand)Hilcorp Energy Company20273K1.01MJan 1993 – Feb 2023
O'Connor, Thomas "A" G-2-267171Tom Oconnor (5400 Sand)Hilcorp Energy Company100Sep 2012 – —

Oil, barrels lease total

Last 12 months 673,200 · prior 12 524,408(+28%)

050K100K150K202420252026

Gas, mcf lease total

Last 12 months 117,526 · prior 12 83,712(+40%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Quintana Pet. Corp.Jan 1993 → Nov 2000
  2. 2Hilcorp Energy CompanyDec 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
748360-99RecompletionHilcorp Energy CompanySep 17, 2012Sep 25, 2012—5,900
508775-99RecompletionHilcorp Energy CompanyMay 10, 2001May 11, 2001May 16, 20015,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 15, 2013O Connor Thomas A O-2-3662Tom Oconnor (5400 Sand)Hilcorp Energy CompanyProducing · shut in Apr 1, 20175,900
Sep 20, 2012O Connor Thomas A G-2-267171Tom Oconnor (5400 Sand)Hilcorp Energy CompanyNot on Schedule—
—Tom Oconnor (5800 SD) Fld. Unit O-2-5280Tom Oconnor (5800)Hilcorp Energy CompanyNot on Schedule—
—Oconnor Thomas -A- O-2-5012Tom Oconnor (5800)Hilcorp Energy CompanyNot on Schedule—
—Oconnor Thomas -A- O-2-1542Tom OconnorHilcorp Energy CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 50 ft elevation.Download CSV →

FormationMD ftSubsea
Surface Sand Clay1,500-1,450
LagartoLARGARTO2,750-2,700
Oakville3,300-3,250
CatahoulaCATAHOULA (MIOCENE)4,100-4,050
AnahuacANAHUAC (MIOCENE)4,365-4,315
FrioFRIO-GRETA (OLIG)4,785-4,735
FrioMIDDLE FRIO5,400-5,350
FrioMIDDLE FRIO (SINTON)5,400-5,350
Frio5,900-5,850
FrioLOWER FRIO5,900-5,850
FrioLOWER FRIO (OLIG)5,900-5,850

Perforations

Perforated and open-hole intervals.

FromToType
5,4445,452Perforated
5,4725,482Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,02314350 S
5.55,8998.75500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00May 29, 2013Apr 16, 2013Yes
00Apr 15, 2013Nov 1, 2012—
00Aug 23, 2001Jun 6, 2001Yes
00Jul 18, 2001——
00Jan 12, 1984——

Well logs

1 log loaded from the RRC's log index, the latest received Sep 25, 2019. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
OtherSpans Surface Sand Clay, Lagarto, Oakville, Catahoula, Anahuac, FrioTIFF1,024 to 5,900Sep 25, 20195.52

"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Sep 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000119456H-1 InjectionNot activated10,0002,0005,870–5,970

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

012025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39102033, documented in the API reference.