TEXAS · WELLS · REFUGIO COUNTY · OCONNOR -D- LEASE · API 42-391-04031 · DISTRICT 02
Oconnor -D- #D-20
Refugio County · Lake Pasture (E-275) field · Vertical
Oconnor -D- #D-20 (API 42-391-04031) is a plugged well in Refugio County, plugged September 20, 2010, last operated by T - C Oil Company.
The RRC has issued 2 drilling permits between 1980 and 1981, permitted to 4,625 ft.
Operator of record
- Based in
- Refugio, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 7, 2011
- Permits on file
- 1,009
- Phone
- (361) 578-6271
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | T - C Oil Company |
| Production reports | T - C Oil Companythrough Mar 2010 |
| Latest permit | T - C Oil CompanyJan 15, 1981 |
- 4,625
- total depth, ft
- 2
- permits on file
- Jan 15, 1981
- last permit issued
- Jan 20, 1981
- completed
- 0
- cumulative oil, bbl
- 7.92K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 20, 1981
- Shut in
- —
- Plugged
- Sep 20, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Oconnor -D- G-2-91872 | Lake Pasture (E-275) | T - C Oil Company | 1 | 0 | 7.92K | Jan 1993 – Sep 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1T - C Oil CompanyAug 2006 → Mar 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 105416-99 | Recompletion | T - C Oil Company | Jan 15, 1981 | Jan 15, 1981 | — | 4,625 |
| 85815-99 | Recompletion | T - C Oil Company | Jul 3, 1980 | Jul 3, 1980 | — | 4,625 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 20, 1981 | Oconnor -D- G-2-91872 | Lake Pasture (E-275) | T - C Oil Company | Plugged | — |
| Jul 14, 1980 | Oconnor -D- G-2-88706 | Lake Pasture (E-293) | T - C Oil Company | Plugged | — |
| Aug 17, 1968 | Oconnor -D- O-2-2834 | Lake Pasture (H-440 Sand) | T-C Oil Company LLC | Plugged | — |
| — | Oconnor -D- O-2-2834 | Lake Pasture (H-440 Sand) | T-C Oil Company LLC | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,835 | 2,839 | Perforated |
| 3,003 | 3,008 | Perforated |
| 4,520 | — | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,533 | 12.25 | 580 S |
| 2.375 | 2,822 | — | — |
| 2.375 | 2,979 | — | — |
| 4.5 | 4,620 | 7.875 | 840 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jan 26, 1981 | — |
| 00 | Jan 12, 1984 | Jul 17, 1980 | — |
| 00 | Jan 12, 1984 | Aug 30, 1968 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-391-04031 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-391-04031 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39104031, documented in the API reference.