TEXAS · WELLS · REFUGIO COUNTY · API 42-391-30206 · DISTRICT 02

Heard Fannie V.W. Mrs. #95

Shut in

Refugio County · Tom Oconnor (4200) field · Temp Abandoned  · Vertical

Heard Fannie V.W. Mrs. #95 (API 42-391-30206) is a well in Refugio County operated by Hilcorp Energy Company, completed September 13, 2006 and listed as temp abandoned on the RRC schedule, shut in October 1, 2012.

The RRC has issued one drilling permit, issued December 14, 2005, permitted to 4,502 ft.

Completion filings report one formation top, including No Change.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Sep 2012
Latest permitHilcorp Energy CompanyDec 14, 2005
4,502
total depth, ft
1
permits on file
Dec 14, 2005
last permit issued
Sep 13, 2006
completed
0
cumulative oil, bbl
449K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 13, 2006
Shut in
Oct 1, 2012
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Heard, Fannie V.W. Mrs. G-2-221832Tom Oconnor (4200)Hilcorp Energy Company1082.9KSep 2006 – Jul 2026
Tom Oconnor 4400 Sand Gas Unit G-2-67324Tom Oconnor (4400)Hilcorp Energy Company10366KJan 1993 – Sep 2006

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hilcorp Energy CompanyJun 2001 → Sep 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
610811-99RecompletionHilcorp Energy CompanyDec 9, 2005Dec 14, 2005—4,502

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 13, 2006Heard Fannie V.W. Mrs. G-2-221832Tom Oconnor (4200)Hilcorp Energy CompanyTemp Abandoned · shut in Oct 1, 20124,502
Jul 15, 2001Tom Oconnor 4400 Sand Gas Unit G-2-67324Tom Oconnor (4400)Hilcorp Energy CompanyNot on Schedule—
—Heard Fannie V. W. Mrs. O-2-2546Tom Oconnor (4500 Greta Mass.)Hilcorp Energy CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 53 ft elevation.Download CSV →

FormationMD ftSubsea
NO Change——

Perforations

Perforated and open-hole intervals.

FromToType
4,1104,127Perforated
4,3224,328Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,02613.75580 S
5.54,5028.751,010 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 9, 2007Oct 4, 2006Yes
00Nov 20, 2006——
00Jan 2, 2002Jul 18, 2001—
00Jan 12, 1984Aug 4, 1976—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Nov 2001
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000045092H-1 InjectionCanceled Feb 12, 2002004,322–4,328

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120002001

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39130206, documented in the API reference.