WELL · 42-391-30230 · DISTRICT 2

Mary F. Lambert -E- #E 4

Shut in

Refugio County · Tom Oconnor (5200 East) field · Shut IN  · Vertical

Mary F. Lambert -E- #E 4 (API 42-391-30230) is a well in Refugio County operated by Hilcorp Energy Company, completed May 25, 2017 and listed as shut in on the RRC schedule, shut in May 1, 2017.

The RRC has issued one drilling permit (amended once), issued September 15, 2009, permitted to 6,010 ft.

Completion filings report 3 formation tops, including Catahoula, Frio, Jackson.

Its 2 leases have reported 22.5K barrels of oil and 56.8K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough May 2017
Latest permitHilcorp Energy CompanySep 15, 2009
6,010
total depth, ft
2
permits on file
Sep 15, 2009
last permit issued
May 25, 2017
completed
22.5K
cumulative oil, bbl
56.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 25, 2017
Shut in
May 1, 2017
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mary F. Lambert -E- O-2-9435Tom Oconnor (5200, East)Hilcorp Energy Company113.4K20.9KMay 2010 – Jul 2026
Lambert, Mary F. O-2-4888Tom Oconnor (5450 Sand)Hilcorp Energy Company19.05K35.9KJan 1993 – Oct 2010

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → May 1995
  2. 2Hilcorp Energy CompanyJan 2006 → May 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
685011-98RecompletionHilcorp Energy CompanyMay 4, 2010Sep 15, 2009Apr 6, 20106,010
685011-99RecompletionHilcorp Energy CompanySep 11, 2009Sep 15, 2009—6,010

Completions

CompletedLeaseFieldOperatorStatusDepth
May 25, 2017Mary F. Lambert -E- O-2-9435Tom Oconnor (5200 East)Hilcorp Energy CompanyShut IN · shut in May 1, 20176,010
Oct 22, 1972Lambert Mary F. O-2-4888Tom Oconnor (5450 Sand)Hilcorp Energy CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 49 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula3,630-3,581
Frio4,358-4,309
JacksonJACKSON/YEGUA——

Perforations

Perforated and open-hole intervals.

FromToType
5,1485,156Perforated
5,2155,247Perforated
5,4865,490Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,55812.25550 S
8.6251,558—550 S
5.55,993—705 S
5.55,9967.875655 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 12, 2017Jul 5, 2017—
00Nov 10, 2010Jun 10, 2010Yes
00Aug 30, 2010——
00Jan 12, 1984Nov 29, 1972—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39130230, documented in the API reference.