WELL · 42-391-31217 · DISTRICT 2

EL Oso Cattle Co. #27

Plugged

Refugio County · Mary Ellen Oconnor (FQ-40 Sand) field  · Vertical

El Oso Cattle CO. #27 (API 42-391-31217) is a plugged well in Refugio County, plugged July 12, 2022, last operated by Amoco Production Company.

The RRC has issued 3 drilling permits between 1978 and 1987, permitted to 6,150 ft.

Operator of record

Amoco Production Company

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Jun 29, 2015
Permits on file
7,201
Phone
(281) 366-7061

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAmoco Production Company
Production reportsnone
Latest permitAmoco Production CompanyMar 26, 1987
6,150
total depth, ft
3
permits on file
Mar 26, 1987
last permit issued
Jul 1, 1978
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 1, 1978
Shut in
—
Plugged
Jul 12, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
EL Oso Cattle Co. O-2-5560Mary Ellen Oconnor (FQ-30)Dolphin Petroleum, LP200Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
328309-99RecompletionAmoco Production CompanyMar 26, 1987Mar 26, 1987—6,150
236569-99RecompletionAmoco Production CompanyApr 19, 1984Apr 24, 1984—6,100
16707-99DrillAmoco Production CompanyJan 20, 1978Jan 20, 1978May 22, 19786,150

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-5560————

Perforations

Perforated and open-hole intervals.

FromToType
4,2464,252Perforated
5,9125,920Perforated
5,9845,992Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,34212.25800 S
9.6251,342—800 S
2.3755,879——
5.56,1508.751,480 S
5.56,150—1,480 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 14, 2003Aug 21, 2003—
00Feb 7, 1989Sep 21, 1988—
00Jan 31, 1989——
00Jun 23, 1987Jun 9, 1987Yes
00Aug 8, 1984Jul 10, 1984—
00Aug 4, 1984Jul 10, 1984—
00Jan 12, 1984Jul 24, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Oct 2017
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000063836H-1 InjectionPlugged Jul 21, 20221,0001,5004,240–4,260

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

012017

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39131217, documented in the API reference.