WELL · 42-391-32387 · DISTRICT 2
Jacks et AL #3
Refugio County · Big Jim (First Sinton) field · Vertical
Jacks ET AL #3 (API 42-391-32387) is a plugged well in Refugio County, plugged August 30, 2004, last operated by Neumin Production Company.
The RRC has issued one drilling permit, issued October 18, 2000, permitted to 7,000 ft.
Completion filings report 3 formation tops, including Greta, First Sinton (Top), Third Sinton (Top).
Its 2 leases have reported 8.77K barrels of oil and 105K mcf of gas since November 2000, last reporting in January 2005. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Point Comfort, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Aug 9, 2023
- Permits on file
- 380
- Phone
- (361) 987-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Neumin Production Company |
| Production reports | Neumin Production Companythrough Nov 2004 |
| Latest permit | Neumin Production CompanyOct 18, 2000 |
- 7,000
- total depth, ft
- 1
- permits on file
- Oct 18, 2000
- last permit issued
- —
- completed
- 8.77K
- cumulative oil, bbl
- 105K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2000 THROUGH Jan 2005
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Aug 30, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jacks et AL O-2-8742 | Big Jim (First Sinton) | Neumin Production Company | 1 | 8.77K | 8.35K | Jun 2002 – Jan 2005 |
| Jacks et AL G-2-182524 | Big Jim (First Sinton) | Neumin Production Company | 1 | 0 | 97K | Nov 2000 – Jun 2002 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Neumin Production CompanyNov 2000 → Nov 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 500963-99 | Drill | Neumin Production Company | Oct 18, 2000 | Oct 18, 2000 | Nov 8, 2000 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-182524 | — | — | — | — |
| — | — O-2-8742 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 64 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| GretaGRETA (TOP) | 4,318 | -4,254 |
| First Sinton (Top) | 5,412 | -5,348 |
| Third Sinton (Top) | 5,790 | -5,726 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,412 | 5,416 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 950 | 12.25 | 390 S |
| 4.5 | 5,623 | 7.875 | 339 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 13, 2002 | — | — |
| 00 | Sep 10, 2001 | Jan 12, 2001 | Yes |
| 00 | Jun 1, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-391-32387 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-391-32387 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39132387, documented in the API reference.