TEXAS · WELLS · REFUGIO COUNTY · SHELTON LEASE · API 42-391-32730 · DISTRICT 02
Shelton #H 1
Refugio County · Hynes Ranch (5950 Sand) field · Shut In · Directional
Shelton #H 1 (API 42-391-32730) is a well in Refugio County operated by Hilcorp Energy Company, completed December 12, 2006 and listed as shut in on the RRC schedule, shut in December 1, 2011.
The RRC has issued one drilling permit (amended once), issued May 23, 2006, permitted to 8,350 ft.
Completion filings report 5 formation tops, including Lagarto, Oakville, Catahoula, Anahuac.
Its lease has reported 5.47K barrels of oil and 6.49K mcf of gas since November 2006, with no volume in the three years through April 2026.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,458
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Jul 2011 |
| Latest permit | Hilcorp Energy CompanyMay 23, 2006 |
- 8,350
- total depth, ft
- 2
- permits on file
- May 23, 2006
- last permit issued
- Dec 12, 2006
- completed
- 5.47K
- cumulative oil, bbl
- 6.49K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2006 THROUGH Jul 2011
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 12, 2006
- Shut in
- Dec 1, 2011
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Shelton O-2-9099 | Hynes Ranch (5950 Sand) | Hilcorp Energy Company | 1 | 5.47K | 6.49K | Nov 2006 – Jul 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hilcorp Energy CompanyDec 2006 → Jul 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 619672-98 | Drill | Hilcorp Energy Company | Jan 29, 2007 | May 23, 2006 | Aug 25, 2006 | 8,350 |
| 619672-99 | Drill | Hilcorp Energy Company | May 22, 2006 | May 23, 2006 | Aug 25, 2006 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 12, 2006 | Shelton O-2-9099 | Hynes Ranch (5950 Sand) | Hilcorp Energy Company | Shut In · shut in Dec 1, 2011 | 8,350 |
Formation tops
As filed on W-2/G-1. Subsea from 60 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,908 | 5,916 | Perforated |
| 5,927 | 5,935 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,300 | 12.25 | 515 S |
| 5.5 | 8,350 | 8.75 | 2,390 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 2, 2007 | Jan 8, 2007 | — |
| 00 | Feb 1, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-391-32730 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-391-32730 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39132730, documented in the API reference.