TEXAS · WELLS · ROBERTS COUNTY · API 42-393-00338 · DISTRICT 08

Haggard TR 4 #30

Y

Roberts County · Quinduno (Albany Dolomite Lo.) field · Producing  · Vertical

Haggard TR 4 #30 (API 42-393-00338) is a well in Roberts County operated by Pantera Energy Company, completed May 27, 2011 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued May 13, 2011, permitted to 6,400 ft.

Completion filings report one formation top, including Lower Albany Dolomite.

Its 3 leases have reported 48.8K barrels of oil and 703K mcf of gas since January 1993, last reporting in July 2026. The leases carry 8 wells, so these are lease totals, not this well alone.

Operator of record

Pantera Energy Company

Based in
Amarillo, TX
P-5 status
Active (A)
P-5 last filed
Oct 1, 2025
Permits on file
359
Phone
(806) 376-6625

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePantera Energy Company
Production reportsPantera Energy Companythrough Apr 2026
Latest permitPantera Energy CompanyMay 13, 2011
6,400
total depth, ft
1
permits on file
May 13, 2011
last permit issued
May 27, 2011
completed
48.8K
cumulative oil, bbl
703K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 27, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Haggard TR 4 G-14-262723Quinduno (Albany Dolomite, Lo.)Pantera Energy Company10145KMay 2011 – Jul 2026
Haggard TR 3 Lec O-14-1581Quinduno (Lecompton)Pantera Energy Company440.6K337KJan 1993 – Jul 2026
Haggard TR 4 Lec O-14-8123Quinduno (Lecompton)Pantera Energy Company38.27K221KMar 2010 – Jul 2026

Gas, mcf lease total

Last 12 months 6,261 · prior 12 8,916(-30%)

01K2K202420252026

Oil, barrels lease total

Last 12 months 616 · prior 12 684(-10%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pennzoil Petroleum CompanyJan 1993 → Jan 1995
  2. 2Pennzoil Exploration & Prod. Co.Feb 1995 → Feb 1999
  3. 3Pennzenergy Exp. & Prod., L.L.C.Mar 1999 → Mar 2000
  4. 4Devon Energy Production Co, L.P.Apr 2000 → Jun 2002
  5. 5Merit Energy CompanyJul 2002 → Aug 2009
  6. 6Pantera Energy CompanyMar 2010 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
716152-99RecompletionPantera Energy CompanyMay 11, 2011May 13, 2011May 20, 20116,400

Completions

CompletedLeaseFieldOperatorStatusDepth
May 27, 2011Haggard TR 4 G-14-262723Quinduno (Albany Dolomite Lo.)Pantera Energy CompanyProducing6,400
Mar 27, 1957Haggard TR 4 Lec O-14-8123Quinduno (Lecompton)Pantera Energy CompanyNot on Schedule—
Mar 27, 1957Haggard TR 3 Lec O-14-1581Quinduno (Lecompton)Pantera Energy CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 3,133 ft elevation.Download CSV →

FormationMD ftSubsea
Lower Albany Dolomite3,986-853

Perforations

Perforated and open-hole intervals.

FromToType
3,9984,106Perforated
—6,226Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,439151,175 S
76,3999.8751,600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 22, 2012Jun 20, 2011—
00Apr 28, 2010——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39300338, documented in the API reference.