WELL · 42-393-00729 · DISTRICT 10

Haggard TR 3 Lec #42

N

Roberts County · Quinduno (Lecompton) field  · Vertical

Haggard TR 3 Lec #42 (API 42-393-00729) is a well in Roberts County operated by Pantera Energy Company, completed June 12, 1984.

The RRC has issued 2 drilling permits between 1984 and 1988, permitted to 6,317 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Pantera Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including Albany Dolomite Lo, Lower Albany Dolomite, Council Grove, Wolfcamp.

No lease production has been reported under this well’s leases.

Operator of record

Pantera Energy Company

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Based in
Amarillo, TX
P-5 status
Active (A)
P-5 last filed
Oct 1, 2025
Permits on file
359
Phone
(806) 376-6625

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePantera Energy Company
Production reportsPantera Energy Companythrough Feb 2011
Latest permitChevron U. S. A. Inc.Jul 18, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,317
total depth, ft
2
permits on file
Jul 18, 1988
last permit issued
Jun 12, 1984
completed
0
cumulative oil, bbl
217K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 12, 1984
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Haggard TR 4 G-14-128465Quinduno (Albany Dolomite, Lo.)Pantera Energy Company10217KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pennzoil Petroleum CompanyJan 1993 → Jan 1995
  2. 2Pennzoil Exploration & Prod. Co.Feb 1995 → Feb 1999
  3. 3Pennzenergy Exp. & Prod., L.L.C.Mar 1999 → Mar 2000
  4. 4Devon Energy Production Co, L.P.Apr 2000 → Jun 2002
  5. 5Merit Energy CompanyAug 2002 → Feb 2010
  6. 6Pantera Energy CompanyMay 2010 → Feb 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
348856-99RecompletionChevron U. S. A. Inc.Jul 14, 1988Jul 18, 1988—6,317
239745-99RecompletionGulf Oil Corp.May 17, 1984May 22, 1984—6,317

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-128465————

Formation tops

As filed on W-2/G-1. Subsea from 3,094 ft elevation.Download CSV →

FormationMD ftSubsea
Albany Dolomite LO3,930-836
Lower Albany Dolomite3,970-876
Council Grove4,190-1,096
WolfcampWOLFCAMP LIME4,460-1,366
LE Compton6,230-3,136

Perforations

Perforated and open-hole intervals.

FromToType
3,9623,966Perforated
3,9764,022Perforated
4,0294,036Perforated
4,0444,048Perforated
4,0664,076Perforated
4,1904,220Perforated
—6,230Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,276—550 S
8.6251,27612.25550 sx
5.56,3167.8752,300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 17, 1988Sep 22, 1988Yes
00Oct 8, 1988——
00Aug 7, 1984Jul 9, 1984—
00Jan 12, 1984Jul 9, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39300729, documented in the API reference.