TEXAS · WELLS · ROBERTS COUNTY · MORRISON, MARY T. -K- LEASE · API 42-393-30618 · DISTRICT 08

Morrison Mary T. -K- #3

Shut in

Roberts County · Morrison Ranch (Morrow Lo.) field · Temp Abandoned  · Vertical

Morrison Mary T. -K- #3 (API 42-393-30618) is a well in Roberts County operated by Complete Oil & Gas Services LLC, completed May 15, 1978 and listed as temp abandoned on the RRC schedule, shut in February 1, 2019.

The RRC has issued one drilling permit, issued January 25, 1978, permitted to 10,750 ft.

It was permitted by Diamond Chemicals Company and has since transferred to Complete Oil & Gas Services LLC on the wellbore schedule.

Its lease has reported 8.97K barrels of oil and 1.55M mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Complete Oil & Gas Services LLC

Permitted by Diamond Chemicals Company; the EWA schedule now lists a different operator.

Based in
Perkins, OK
P-5 status
Active (A)
P-5 last filed
Oct 9, 2025
Phone
(405) 788-0433

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleComplete Oil & Gas Services LLC
Production reportsComplete Oil & Gas Services, LLCthrough Feb 2021
Latest permitDiamond Chemicals CompanyJan 25, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,750
total depth, ft
1
permits on file
Jan 25, 1978
last permit issued
May 15, 1978
completed
8.97K
cumulative oil, bbl
1.55M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2021

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 15, 1978
Shut in
Feb 1, 2019
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Morrison, Mary T. -K- G-14-76994Morrison Ranch (Morrow Lo.)Complete Oil & Gas Services, LLC18.97K1.55MJan 1993 – Feb 2021

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maxus Exploration CompanyJan 1993 → Jan 1995
  2. 2Midgard Energy CompanyFeb 1995 → Sep 1997
  3. 3Crescendo Resources, L.P.Oct 1997 → Mar 2000
  4. 4Amoco Production CompanyApr 2000 → Dec 2001
  5. 5BP America Production CompanyJan 2002 → Aug 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
17021-99DrillDiamond Chemicals CompanyJan 25, 1978Jan 25, 1978Feb 26, 197810,750

Completions

CompletedLeaseFieldOperatorStatusDepth
May 15, 1978Morrison Mary T. -K- G-14-76994Morrison Ranch (Morrow Lo.)Complete Oil & Gas Services LLCTemp Abandoned · shut in Feb 1, 201910,750

Perforations

Perforated and open-hole intervals.

FromToType
10,54210,659Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,145—1,100 S
79,419—125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39330618, documented in the API reference.