TEXAS · WELLS · ROBERTS COUNTY · API 42-393-30794 · DISTRICT 10

Jameson, M. O. "55" #1

Plugged

Roberts County  · Vertical

Jameson, M. O. "55" #1 (API 42-393-30794) is a plugged well in Roberts County, plugged October 17, 1981, last operated by Hng Oil Company.

The RRC has issued one drilling permit, issued June 10, 1980, permitted to 7,600 ft.

Operator of record

HNG Oil Company

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 25, 1986
Permits on file
1,121
Phone
(432) 686-3714

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitHNG Oil CompanyJun 10, 1980
7,600
total depth, ft
1
permits on file
Jun 10, 1980
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Oct 17, 1981

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
83445-99DrillHNG Oil CompanyJun 10, 1980Jun 10, 1980—7,600

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39330794, documented in the API reference.