TEXAS · WELLS · ROBERTS COUNTY · API 42-393-30856 · DISTRICT 08

Mahler #5

Shut in

Roberts County · Mendota NW. (Granite Wash SW.) field · Shut In  · Vertical

Mahler #5 (API 42-393-30856) is a well in Roberts County operated by Unit Petroleum Company, completed October 28, 1982 and listed as shut in on the RRC schedule, shut in July 1, 2013.

The RRC has issued one drilling permit, issued March 4, 1981, permitted to 10,706 ft.

It was permitted by Amoco Production Company and has since transferred to Unit Petroleum Company on the wellbore schedule.

Its 2 leases have reported 122K barrels of oil and 2.51M mcf of gas since January 1993, last reporting in July 2026. The leases carry 9 wells, so these are lease totals, not this well alone.

Operator of record

Unit Petroleum Company

Permitted by Amoco Production Company; the EWA schedule now lists a different operator.

Based in
Tulsa, OK
P-5 status
Active (A)
P-5 last filed
Jan 13, 2025
Permits on file
1,100
Phone
(918) 493-7700

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAmoco Production Company
Production reportsUnit Petroleum Companythrough Jun 2013
Latest permitAmoco Production CompanyMar 4, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,706
total depth, ft
1
permits on file
Mar 4, 1981
last permit issued
Oct 28, 1982
completed
122K
cumulative oil, bbl
2.51M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 28, 1982
Shut in
Jul 1, 2013
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mahler O-14-5061Mendota, NW. (Douglas, Lo.)Unit Petroleum Company13.48K904Jan 1993 – Jul 2026
Mahler O-14-5257Mendota, NW. (Granite Wash, SW.)Unit Petroleum Company8119K2.5MJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Unit Petroleum CompanyJan 1993 → Jun 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
110792-99DrillAmoco Production CompanyMar 4, 1981Mar 4, 1981—10,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 28, 1982Mahler O-14-5257Mendota NW. (Granite Wash SW.)Unit Petroleum CompanyShut In · shut in Jul 1, 200710,706
Oct 2, 1981Mahler O-14-5061Mendota NW. (Douglas Lo.)Unit Petroleum CompanyShut In · shut in Jul 1, 201310,706
Jan 24, 1982Mahler G. A. G-14-100497Mendota NW. (Granite Wash SW.)Amoco Production CompanyNot on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
6,9767,000Perforated
9,59510,066Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,93612.252,400 S
2.3756,927——
2.3759,984——
710,7068.751,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Nov 1, 1982—
00Jan 12, 1984Feb 22, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39330856, documented in the API reference.