TEXAS · WELLS · ROBERTS COUNTY · WEBB, LESLIE ET AL -M- LEASE · API 42-393-30919 · DISTRICT 08
Webb Leslie et al -M- #2
Roberts County · Mendota NW. (Cherokee) field · Vertical
Webb Leslie ET AL -M- #2 (API 42-393-30919) is a plugged well in Roberts County, plugged April 25, 2000, last operated by Amoco Production Company.
The RRC has issued one drilling permit, issued February 12, 1982, permitted to 11,450 ft.
It was permitted by Diamond Chemicals Company and has since transferred to Amoco Production Company on the wellbore schedule.
Operator of record
Permitted by Diamond Chemicals Company; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jun 29, 2015
- Permits on file
- 7,201
- Phone
- (281) 366-7061
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Amoco Production Company |
| Production reports | Crescendo Resources, L.P.through Apr 1999 |
| Latest permit | Diamond Chemicals CompanyFeb 12, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,450
- total depth, ft
- 1
- permits on file
- Feb 12, 1982
- last permit issued
- Jun 29, 1982
- completed
- 0
- cumulative oil, bbl
- 38.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2000
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 29, 1982
- Shut in
- —
- Plugged
- Apr 25, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Webb, Leslie et al -M- G-14-101520 | Mendota, NW. (Cherokee) | Amoco Production Company | 1 | 0 | 38.7K | Jan 1993 – Apr 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Maxus Exploration CompanyJan 1993 → Jan 1995
- 2Midgard Energy CompanyFeb 1995 → Sep 1997
- 3Crescendo Resources, L.P.Oct 1997 → Apr 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 150990-99 | Drill | Diamond Chemicals Company | Feb 12, 1982 | Feb 12, 1982 | — | 11,450 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 29, 1982 | Webb Leslie et al -M- G-14-101520 | Mendota NW. (Cherokee) | Amoco Production Company | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,419 | 10,444 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,503 | 12.25 | 1,500 S |
| 2.375 | 10,440 | — | — |
| 7 | 10,928 | 8.75 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Aug 10, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-393-30919 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-393-30919 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39330919, documented in the API reference.