WELL · 42-393-31155 · DISTRICT 10
Flowers -75- #4A
Roberts County · Cree-Flowers (Wolfcamp Dolomite) field · Vertical
Flowers -75- #4A (API 42-393-31155) is a plugged well in Roberts County, plugged August 1, 2011, last operated by Plains Exploration & Prod. CO..
The RRC has issued one drilling permit, issued November 26, 1990, permitted to 4,500 ft.
It was permitted by Alpar Resources, Inc. and has since transferred to Plains Exploration & Prod. CO. on the wellbore schedule.
Completion filings report one formation top, including Brn Dolo.
Operator of record
Plains Exploration & Prod. Co.
Permitted by Alpar Resources, Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 12, 2012
- Permits on file
- 354
- Phone
- (713) 579-6578
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Plains Exploration & Prod. Co. |
| Production reports | Latigo Petroleum, Inc.through Jul 2009 |
| Latest permit | Alpar Resources, Inc.Nov 26, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,500
- total depth, ft
- 1
- permits on file
- Nov 26, 1990
- last permit issued
- Jan 4, 1991
- completed
- 0
- cumulative oil, bbl
- 935K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 4, 1991
- Shut in
- —
- Plugged
- Aug 1, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Flowers -75- G-14-137270 | Cree-Flowers (Wolfcamp Dolomite) | Latigo Petroleum, Inc. | 1 | 0 | 935K | Jan 1993 – Jul 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Alpar Resources, Inc.Jan 1993 → Nov 2003
- 2Latigo Petroleum Texas, LPDec 2003 → Feb 2009
- 3Latigo Petroleum, Inc.Mar 2009 → Jul 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 380499-99 | Drill | Alpar Resources, Inc. | Nov 1, 1990 | Nov 26, 1990 | Nov 29, 1990 | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-137270 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,828 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BRN Dolo | 3,750 | -922 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,803 | 3,813 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,015 | 12.25 | 510 S |
| 5.5 | 4,040 | 7.875 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 8, 1991 | Jan 10, 1991 | Yes |
| 00 | Mar 21, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-393-31155 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-393-31155 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39331155, documented in the API reference.