WELL · 42-393-31240 · DISTRICT 10
Flowers -75- #2D
Roberts County · Cree-Flowers (Wolfcamp Dolomite) field · Vertical
Flowers -75- #2D (API 42-393-31240) is a plugged well in Roberts County, plugged July 22, 2011, last operated by Plains Exploration & Prod. CO..
The RRC has issued one drilling permit (amended once), issued October 19, 1994, permitted to 4,300 ft.
It was permitted by Alpar Resources, Inc. and has since transferred to Plains Exploration & Prod. CO. on the wellbore schedule.
Completion filings report one formation top, including Brn Dolo.
Operator of record
Plains Exploration & Prod. Co.
Permitted by Alpar Resources, Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 12, 2012
- Permits on file
- 354
- Phone
- (713) 579-6578
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Plains Exploration & Prod. Co. |
| Production reports | Latigo Petroleum, Inc.through Jun 2009 |
| Latest permit | Alpar Resources, Inc.Oct 19, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,300
- total depth, ft
- 2
- permits on file
- Oct 19, 1994
- last permit issued
- Dec 2, 1994
- completed
- 0
- cumulative oil, bbl
- 539K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 1994 THROUGH Jul 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 2, 1994
- Shut in
- —
- Plugged
- Jul 22, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Flowers -75- G-14-152092 | Cree-Flowers (Wolfcamp Dolomite) | Latigo Petroleum, Inc. | 1 | 0 | 539K | Dec 1994 – Jul 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Alpar Resources, Inc.Jan 1995 → Nov 2003
- 2Latigo Petroleum Texas, LPDec 2003 → Feb 2009
- 3Latigo Petroleum, Inc.Mar 2009 → Jun 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 429186-98 | Drill | Alpar Resources, Inc. | Nov 15, 1994 | Oct 19, 1994 | Nov 17, 1994 | 4,300 |
| 429186-99 | Drill | Alpar Resources, Inc. | Oct 18, 1994 | Oct 19, 1994 | — | 4,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-152092 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,740 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BRN Dolo | 3,688 | -948 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,688 | 3,722 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,035 | 12.25 | 488 S |
| 4.5 | 4,015 | 7.875 | 120 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 11, 1995 | Dec 19, 1994 | Yes |
| 00 | Dec 30, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-393-31240 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-393-31240 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39331240, documented in the API reference.